numpy>=1.24
scipy>=1.10
opencv-python-headless>=4.8
pymupdf>=1.24
matplotlib>=3.7
pillow>=10.0
reportlab>=4.0
openpyxl>=3.1
ezdxf>=1.1
pytesseract>=0.3.10
# pytesseract needs the Tesseract OCR engine installed on your system too (pip
# alone isn't enough). It's only used as a fallback for drawings whose PDF has
# no extractable text layer (common with some CAD exports).
#   macOS:   brew install tesseract
#   Ubuntu:  sudo apt-get install tesseract-ocr
#   Windows: https://github.com/UB-Mannheim/tesseract/wiki
