About MEPVirtual and its developer
MEPVirtual is an independent engineering learning and reference platform with interactive labs, worked calculations and practical articles.
About Eng. Mannan Maqsood
Eng. Mannan Maqsood is an electrical engineer and the founder of MEPVirtual. He has more than 21 years of experience in the UAE and New Zealand across high-rise residential and commercial buildings, hospitality, healthcare, government facilities and rail infrastructure.
From August 2022 to July 2025, he worked as a Project Electrical Engineer on Auckland’s City Rail Link at Mt Eden. His work included electrical installation coordination, LV distribution, UPS and emergency power, earthing and bonding, inspections, testing and handover. In Dubai, his senior consulting work includes reviewing switchgear, lighting, fire alarm and ELV designs and submittals, following up site quality issues and checking commissioning evidence.
Mannan holds a Bachelor of Engineering in Electronics and Communication Engineering, assessed by NZQA as a Level 7 bachelor’s degree. He created MEPVirtual to explain how engineering decisions are checked in design, on site and at handover. His articles identify whether an example comes from a site observation, a technical review or a calculation prepared for teaching.
Contributors
Eng. Mannan Maqsood, Electrical Engineer and founder, writes the electrical, ELV and life safety articles, the design-review articles drawn from his own projects, and edits all published content.
Eng. A.A.Q, Senior Mechanical Engineer, writes the HVAC, plumbing, drainage and fire protection articles. Follow both on MEPVirtual on LinkedIn.
Who the platform is for
Students can explore how a system behaves. Site engineers can practise checks before an inspection. Designers and reviewers can compare assumptions and use the tools as a starting point for documented project calculations.
Independent engineering reference
MEPVirtual is not an authority, certification body or manufacturer approval service. References to DEWA, other UAE authorities, AS/NZS or international standards identify the engineering context. They do not imply endorsement or permission to use a tool as a certified design method.
Content and corrections
All content is general technical information for education. Read the full disclaimer before relying on any article, lab or calculation.
The labs use simplified models where appropriate for training. Some reference libraries and tools require an internet connection; offline availability depends on previously cached resources. Read the assumptions within each module and the editorial approach before project use.
For a correction or question, use the contact form and identify the module and issue. For worked calculation explanations, visit the learning guides.