Free virtual labs and engineering calculators for electrical (LV, MV and HV), HVAC, fire alarm and ELV systems. Explore HV and MV substations, switchgear checks, cable containment, FAHU operation, earthing, solar PV and more. Work through real engineering scenarios, inspect results and learn how systems behave.
Start here: Search for a system, choose a lab, change the inputs and compare the results. Built for students, site engineers and experienced MEP professionals.
A short email with one fault from a real project: what went wrong, why, and how it was fixed. Drawn from the MEPVirtual library of 415 site cases. Free, and you can leave at any time.
Step into a virtual tower as the MEP engineer. Size the switchgear, pumps and AHU, isolate safely, commission with real instruments and find the injected fault before handover.
Privacy and site information:
Pick a tool below - each one opens as its own full workspace in a new tab.
These topics are available inside the following existing modules. Plumbing and Fire Fighting are calculator sections of the MEP Toolbox.
Every calculator, checklist and interactive diagram across the labs, grouped by tool. Click a card to open that tool, then use the tab or section named on it.
Standalone software tools built alongside the site. Run locally on your own machine.
Give it a floor plan (PDF, image or DXF) and it places access points, predicts coverage, and writes a full design proposal: signal, SINR and redundancy heatmaps, an AP schedule, cabling/PoE plan, bill of materials and a client-ready PDF.
Read the assumptions, calculation steps and practical checks before using a lab.
Get to know the platform, find your next lab or help shape what comes next.
ยฉ 2026 Eng. Mannan Maqsood | Engineering Excellence Through Interactive Labs
VERIFY ALL FIGURES AGAINST CURRENT MANUFACTURER DATASHEETS AND LOCAL AUTHORITY REQUIREMENTS BEFORE DESIGN SIGN-OFF.