NZ EWRB registration exam practice

Electrical workers in New Zealand register with the Electrical Workers Registration Board under the Electricity Act 1992. The regulations exam is typically a computer-based multiple-choice paper with permitted reference material, so knowing where to find answers quickly matters as much as memorizing them.

The main themes are the Electricity (Safety) Regulations 2010, prescribed electrical work and its risk categories, certification (Certificate of Compliance, Electrical Safety Certificate, Record of Inspection), the high-risk database, the electrical codes of practice such as NZECP 34, and AS/NZS 3000 for New Zealand. The lab's open-book mode mirrors that format.

Start a timed EWRB examPractise with explanationsCalculation drills

What the questions cover

Cables & voltage drop, Calculations, Earthing & bonding, Fire, life safety & ELV, Protection & RCDs, Regulations & procedures, Renewables & EV, Safety & isolation, Special locations, Supply & earthing, Testing & inspection.

Main references: Electricity Act 1992, Electricity (Safety) Regulations 2010, AS/NZS 3000:2018, NZECP 34.

Key values to know

Sample questions with answers

1. The Electricity (Safety) Regulations 2010 are made under which Act?

  1. Health and Safety at Work Act 2015
  2. Electricity Act 1992
  3. Building Act 2004
  4. Electricity Industry Act 2010
Show the answer

Answer: B - Electricity Act 1992

The ESR 2010 are secondary legislation under the Electricity Act 1992. They cover prescribed electrical work, certification and safety of works, installations, fittings and appliances.

Reference: Electricity (Safety) Regulations 2010

2. An Electrical Safety Certificate (ESC) also confirms that the electrical work complies with the building code for the purposes of which Act?

  1. Electricity Act 1992
  2. Building Act 2004
  3. Resource Management Act 1991
  4. Health and Safety at Work Act 2015
Show the answer

Answer: B - Building Act 2004

The ESC confirms the installation is safe to connect and also confirms building code compliance under section 19(1)(e) of the Building Act 2004, so no separate building consent sign-off is needed for that electrical work.

Reference: ESR 2010, reg. 74A; Building Act 2004 s19(1)(e)

3. Which of these are EWRB registration classes?

  1. Electrician
  2. Electrical inspector
  3. Electrical engineer
  4. Solar technician
Show the answer

Answer: A, B, C - Electrician; Electrical inspector; Electrical engineer

Registration classes include electrician, electrical engineer, electrical inspector, electrical appliance serviceperson, line mechanic and others. 'Solar technician' is not a class; PV work is done under existing classes.

Reference: Electricity Act 1992; EWRB

4. Which NZ Electrical Code of Practice covers homeowner or occupier electrical wiring work in domestic installations?

  1. NZECP 51
  2. NZECP 34
  3. NZECP 35
  4. NZECP 46
Show the answer

Answer: A - NZECP 51

NZECP 51 sets out what a homeowner may do on their own domestic wiring and how. NZECP 46 covers high voltage live work.

Reference: NZECP 51

5. Under the Health and Safety at Work Act 2015, who has the primary duty of care for workers' health and safety?

  1. The PCBU (person conducting a business or undertaking)
  2. WorkSafe only
  3. The customer only
  4. The EWRB
Show the answer

Answer: A - The PCBU (person conducting a business or undertaking)

The PCBU has the primary duty, so far as reasonably practicable. Workers also have duties to take reasonable care and follow instructions.

Reference: Health and Safety at Work Act 2015, s36

6. Which earthing system is used for LV installations supplied from the public network in Australia and New Zealand?

  1. TT
  2. IT
  3. MEN (a form of TN-C-S)
  4. TN-S only
Show the answer

Answer: C - MEN (a form of TN-C-S)

Australia and New Zealand use the Multiple Earthed Neutral (MEN) system. The supply neutral is earthed at many points on the network and connected to the installation earth at the main switchboard through the MEN link.

Reference: AS/NZS 3000:2018 Section 5

7. Which appendix of AS/NZS 3000 gives the method for estimating maximum demand?

  1. Appendix A
  2. Appendix B
  3. Appendix C
  4. Appendix J
Show the answer

Answer: C - Appendix C

Appendix C covers maximum demand estimation, along with other circuit arrangement guidance. Appendix B covers circuit protection guidance including loop impedance.

Reference: AS/NZS 3000:2018 Appendix C

8. Which standard covers periodic verification of existing electrical installations?

  1. AS/NZS 3019
  2. AS/NZS 3012
  3. AS/NZS 3003
  4. AS/NZS 3001
Show the answer

Answer: A - AS/NZS 3019

AS/NZS 3019 covers periodic verification, for example before reconnecting an installation that has been disconnected for a long period.

Reference: AS/NZS 3019

Practise the full paper

The Electrical Licensing Exam Lab has timed papers with an answer sheet, calculation drills with fresh numbers every time, tap-the-diagram and virtual instrument questions, 3D labs, a daily challenge and automatic pass or fail results with a full review.

Start a timed EWRB examPractise with explanationsCalculation drillsOpen the visual labs

Other exam guides

DEWA electrical engineer exam practiceAbu Dhabi electrical exam practice (DoE, ADDC, AADC)SEWA electrical exam practice (Sharjah)EtihadWE electrical exam practice (formerly FEWA)Australian electrical licensing practice (AS/NZS 3000)CPEng readiness: New Zealand and Australia

These questions are written from the published regulations and standards and are not copied from any real exam. Authorities and boards do not publish their question banks, and pass marks and formats can change, so confirm the current details with the body concerned.