E-138 · ELECTRICAL · SAFETY

LV Arc Flash & Fault Level Lab

Work out the prospective fault current at an LV board from the transformer and cable, then the arcing current, incident energy and arc flash boundary with the IEEE 1584-2018 model for 208 to 600 V. See how the protection clearing time drives the energy, pick the PPE rating and print the warning label.

IEEE 1584-2018NFPA 70EIEC 60909BS EN 61482AS/NZS 4836DEWA

How to use: pick the equipment type to load typical gap, distance and enclosure size, then set the source and the protective device. Tap i for help on any input.

1. Inputs

Fault level at the board
Equipment and electrodes
Protective device upstream

2. Arc flash results

Warning label, a 3D view of the boundary around the board and how the energy grows with clearing time.

3. Checks

    4. Two arcing current cases

    IEEE 1584-2018 checks both the full arcing current and the reduced one, because a lower current can trip the device slower.

    5. PPE rating bands (NFPA 70E style)

    6. How it works

    Fault level

    The bolted three phase fault current at the board comes from the transformer impedance plus the cable impedance: I = V / (√3 × Z). Close to a large transformer it is high, at the end of a long cable it drops quickly.

    Arcing current and the reduced case

    An arc has resistance, so the arcing current is lower than the bolted fault current. IEEE 1584-2018 also works out a reduced arcing current using a variation factor. The protection may be slower at the lower current, so both cases are checked and the higher energy is used.

    Incident energy and boundary

    Incident energy rises in direct proportion to the clearing time, and falls with distance. The arc flash boundary is the distance at which the energy drops to 1.2 cal/cm², the onset of a second degree burn on bare skin. Electrode configuration and enclosure size matter: VCBB and HCB push energy out of the box towards the worker.

    How to cut the energy

    Faster clearing is the biggest lever: an instantaneous setting, a maintenance switch (energy reducing maintenance setting), zone selective interlocking or arc flash relays with light sensors. Remote racking and working from further away help too.

    Learning tool using the published IEEE 1584-2018 equations for 208 to 600 V. A formal arc flash study needs the full network model and coordinated device curves from software. Verify before labelling real equipment.

    Quick summary in your language

    Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

    This lab calculates the fault level and arc flash energy at an LV board and gives the PPE rating and label. Never work on live equipment without the right PPE and a permit.

    About this lab: LV Arc Flash & Fault Level Lab

    LV Arc Flash & Fault Level Lab

    Work out the fault level at an LV board, then the IEEE 1584-2018 arcing current, incident energy, arc flash boundary, PPE rating and a printable warning label for 208 to 600 V equipment.

    Topics you can explore

    • Bolted fault current from transformer and cable
    • IEEE 1584-2018 arcing current
    • Arcing current variation factor
    • Enclosure size correction
    • Incident energy and arc flash boundary
    • PPE categories
    • Arc flash labels

    Practical engineering example

    A 400 V main LV switchgear next to a 1500 kVA, 6% transformer sees about 36 kA bolted fault current and 22 kA arcing current. With VCB electrodes, a 32 mm gap and a 610 mm working distance, a 50 ms instantaneous trip gives about 1.9 cal/cm² (Category 1). If the instantaneous is off and the breaker waits 300 ms, the energy rises to about 11 cal/cm² and the boundary moves out to about 2.5 m (Category 3).

    Developed by Eng. Mannan Maqsood. Verify against current project requirements and the applicable authority rules.

    Project checks

    Keep prospective fault current and incident energy as distinct results. Review operating lineups, protective device settings and the approved assessment method before using either result in a safety decision.

    NEXT STEP

    Where to go from here

    Related labs that pick up where this one ends.

    Cable Pulling & Conduit Fill LabInstall the cables to the board.E-139 →LV Switchgear Design LabDesign the board itself.E-127 →Fault Level Lab (HV)Fault levels upstream.HV-506 →Permit to Work LabSafe work on live equipment.SITE-501 →
    Your work in each lab is saved in this browser.Save or move my progress · All 127 labs · Ask the Copilot