MEPVirtual - Engineering Knowledge Hub

ENGINEERING VIRTUAL LABS

Design. Calculate. Verify. Comply.

๐Ÿ“…
๐Ÿ•’
๐ŸŒ ENGINEERING REFERENCE: DUBAI ยท DEWA
โ— 127 LABS LIVE

All engineering labs

Every MEPVirtual module in one place, grouped by discipline. Open “Explore inside” on any card to see its tools and topics before you open it.

MEPVirtual is a free set of interactive engineering labs, calculators and reference tools for electrical, ELV, HVAC, plumbing and fire systems, built from real project work in the Gulf, Australia and New Zealand. Nothing is locked, nothing needs an account, and every lab shows its formulas, its assumptions and its limits rather than returning a number you cannot check.

Most modules run in 2D, 3D and 4D, and several go to 5D with cost and carbon, so you can watch a system behave, step through an assembly sequence or play a fault out in milliseconds instead of reading about it. Coverage runs from switchgear design and IEC 61439 verification, busbar risers, wiring diagrams, cable and containment sizing, earthing and lightning protection, generators, UPS, central battery systems and solar PV, through HVAC plant, diagnostics and commissioning, to CCTV, BMS, structured cabling, public address and fire alarm design.

Authority routes are covered for DEWA, SEWA, ADDC, AADC, EtihadWE, Kahramaa and SEC, alongside AS/NZS, IEC, BS EN, NFPA and ASHRAE practice. The Exam Lab carries timed licensing practice for DEWA, SEWA, Abu Dhabi, EtihadWE, Australian AS/NZS 3000, NZ EWRB registration and CPEng readiness, and the Copilot answers from a library of engineering questions and real site fault cases. Start with a module card, open “Explore inside” to see what a lab contains, or ask the Copilot if you are not sure where to begin.

Site Engineering Track (8 modules)

See the full learning path โ†’

Permit to Work & Site Safety Lab SITE-501

Permit selector for 15 site activities, 5x5 risk assessment, LOTO and prove-dead simulator, hot work permit check and a 3D/4D SIMOPS site day.

FC & Shop Drawings Lab SITE-502

FC vs shop drawings, title block and ISO 19650 number decoder, spot-the-difference review, superseded prints and a 3D FC/shop/as-built void.

Snag & Punch List Manager SITE-504

Pin snags on a plan, A/B/C categories, fixed and verified workflow, spot-the-snag game, 3D pins and a burndown to the handover date.

FAT, SAT & Site Testing Lab SITE-506

Megger IR with PI and DAR, R1+R2 and Zs, RCD trip times, hydrostatic pressure test with gauge and 3D rig, and FAT/SAT witness checklists.

Method Statement Studio SITE-507

Build an MEP method statement, ITP, JSEA and inspection checklist: 31 activities, UAE, KSA, Qatar, UK, AU and NZ codes, 5x5 risk matrix, Word export.

Spot the Fault Weekly Challenge SITE-508

A new MEP site scene every Monday: find three hidden installation faults, learn the BS 7671, DEWA, BS 5839 or AS/NZS 3000 rule behind each, keep your streak.

Design Engineering Track (6 modules)

See the full learning path โ†’

Codes & Authority Rules Navigator DES-601

Code hierarchy, authority and code navigator for 8 regions, which-code-answers-it trainer, order of precedence and a compliance checker, with a 3D code map and 4D approval route.

Symbols, Legends, SLD & P&ID Reader DES-602

40-symbol library and flashcards, layout take-off practice, a clickable SLD with path tracing and mains failure, a chilled water P&ID and an ISA tag decoder.

Fixture Units & Drainage Slope Lab DES-605

Fixture schedule, peak water flow and pipe sizing, BS EN 12056-2 drain sizing, gradients, inverts and long section, 3D drain with a 4D flush wave.

Electrical & General Engineering (46 modules)

Busbar Riser Engineering Guide E-101

Size a riser to IEC 61439-6 or AS/NZS 61439.6 with derating, voltage drop and fault level, in 2D, 3D, 4D and 5D.

DEWA Design Tools & UAE Regs Reference E-102

Cable and breaker selector, switchboard builder and an independent regulations reference for DEWA, SEWA, Abu Dhabi and EtihadWE.

Switchgear & DB Checklist Suite E-103

Eight panel checklists, a DEWA power factor calculator, busbar and MCCB checks, with Word, Excel and PDF exports.

Electrical & ELV T&C Tracker E-104

Track testing and commissioning from first energisation to handover, with witness records and a printable report.

AS/NZS 3000 Practice Notes E-105

MEN earthing, RCD requirements, protection, isolation and bathroom zones explained for Australian and New Zealand practice.

Copper, Cable & Busbar Cost Virtual Lab E-106

Compare cable against busbar on cost, with copper price variation, containment allowances and installed rates.

Switchgear Reference & Variation Tracker E-107

Look up devices by brand, range and rating, and track variations against the contract scope using your own quoted prices.

Meter Lab - Testing Instrument Reference E-108

What each test instrument measures, how to use it safely and what the reading actually tells you.

UAE, NZ & Australia Engineering Regulations E-109

Compare the authority requirements across the UAE, Australia and New Zealand, with a project readiness check.

Earthing, Bonding & Lightning Protection Portal E-111

Thirty modules, fifteen calculators and thirty-eight drawings covering earthing, bonding, IEEE 80 grids and lightning protection.

Standby Generators & Emergency Power E-112

Generator sizing, step loads, fuel runtime, transfer schemes and the tests that prove them.

UPS & Critical Power Systems E-113

UPS topologies, battery sizing, autonomy, room ventilation and the maintenance that keeps autonomy real.

Electrical & ELV Codes & Standards Virtual Lab E-114

Which standard governs what, across IEC, BS EN, NFPA and AS/NZS, with compliance workflows for each discipline.

Next-Gen MEP Virtual Engineering Toolbox E-115

Calculators across electrical, HVAC, plumbing and fire fighting, with editable inputs and the working shown.

MEPVirtual Engineer Copilot E-116

Ask in plain words. It finds the right lab and tab, answers from the reference libraries and runs the calculation in 2D, 3D and 4D.

Cable Tray & Containment Virtual Lab E-117

Tray sizing, fill, spare capacity, supports and segregation, with 2D and 3D layouts.

MEPVirtual Q&A Knowledge Hub E-119

Thousands of engineering questions and answers across design, site and commissioning, searchable by trade and stage.

Solar PV & Renewable Energy Integration Lab E-120

String sizing against cold Voc and hot Vmp, inverter limits, roof loading and grid connection checks.

Clash Detection Lab E-121

Service coordination and clash detection with clearance rules, priority logic and reroute options in 3D.

MEP Specification Generator E-123

Build specification sections for electrical and building services, with options, standards and export to Word.

CBS & Emergency Lighting Virtual Lab E-124

Central battery systems and emergency lighting: battery sizing, autonomy, circuit voltage drop and a submittal checklist.

Unified MEP Design Labs E-125

Six linked design labs on one page: jurisdiction rules, cooling load, cable and breaker sizing, IEEE 80 earthing and drainage.

LV Switchgear Design Lab E-127

Design an MDB, MCC or distribution board with live single line, front GA, 3D model, 4D assembly sequence and 5D cost.

Harmonics & Power Quality Lab E-130

Isc/IL for single, parallel or split-bus transformers, load spectra, THDi, TDD and THDv against IEEE 519-2022 including even and interharmonics, derated active filter sizing and detuned capacitor resonance.

Facade & Architectural Lighting Lab E-131

LED run load and DC voltage drop with end, both-end and mid feed, PSU and driver sizing, inrush and drivers per MCB, DMX512 universes and address map, wall illuminance and luminance, and a 4D dusk-to-midnight show with energy, cost and CO2.

Healthcare Electrical Lab E-132

Hospital room classification (Group 0/1/2, body and cardiac-protected areas), supply branches and changeover times, medical IT and isolated power sizing, insulation fault simulator, bonding, generators and UPS, imaging feeders, a 3D operating theatre and a 4D mains failure replay.

Data Center Power Lab E-133

Build N, N+1, 2N and distributed redundant topologies, break components and test Tier III concurrent maintainability, size UPS, batteries and generators, model PUE, explore a 3D data hall and replay a utility failure with server inlet temperatures.

Load Schedule Auditor & SLD Generator E-134

Upload Excel DB, SMDB and MDB load schedules to check phase balance, breaker vs cable sizes, RCDs and totals, then generate the single line diagram, a corrected schedule, T&C sheets, BOQ and cable schedule, or rebuild a load schedule from an existing SLD (DXF or PDF). Runs in your browser, nothing is uploaded.

Authority Submission Pack Builder E-135

Build a DEWA, ADDC, SEWA or NZ load application pack: maximum demand, transformers, fault level, SLD, cable and VD schedule, checklist and timeline.

Career Ladder Tracker E-136

Track your path to CPEng NZ, CPEng Australia, CEng/IEng or UAE authority approval. Map labs, exam scores and project evidence to each competency.

Pocket Site Calculator MEP-802

Phone-sized quick calcs for site: conversions, current, voltage drop, Ohm's law, pipe and duct velocity, cooling.

EV Charging in Car Parks Lab E-137

Charger count and mix, static and dynamic load management, transformer impact over 24 hours and DEWA, NZ and AU rules.

Energy Audit & Payback Lab E-140

Sub-meter end uses, DEWA slab tariff, LED, controls, VSD and setpoint savings with payback, NPV and carbon.

Fire Stopping Selector MEP-804

Generic penetration seal by service, material, size, wall or floor and rating, with a printable penetration schedule.

High Voltage Academy (17 modules)

Seventeen labs for 11 kV to 132 kV networks, from utility rules and substation layout to protection, GIS and energisation. Open the HV Academy โ†’

Regional Regulation & Utility Engine HV-501

Compare HV voltages, utilities, earthing, phase colours and standards for the UAE, Saudi Arabia, Australia, New Zealand, Singapore and Malaysia. Free lab.

HV Switchgear & Ring Main Unit Lab HV-503

Select RMU ratings to IEC 62271, size HV fuses and relays, practise switching with live interlocks and explore a 3D ring main unit. Free interactive lab.

HV Cable Engineering Lab HV-505

Rate 11 to 33 kV cables to IEC 60287, check short-circuit withstand to IEC 60949, compare laying methods and see heat maps and a 3D cable trench. Free lab.

Fault Level & Short Circuit Lab HV-506

Calculate HV and LV fault levels to IEC 60909: peak, breaking and thermal currents, switchgear ratings, waveforms, 3D busbar forces and earth faults.

Protection & Coordination Studio HV-507

Grade HV relays, fuses and LV breakers on a live time-current chart, simulate faults in 4D, test 87T differential and REF, and print a setting sheet.

HV Substation Earthing Lab HV-508

Design an IEEE 80 earth grid, calculate GPR, touch and step voltages, see the surface potential in 3D, run a Wenner soil test and check hot zones. Free lab.

Insulation Coordination & Surge Lab HV-509

Select surge arresters, check LIWL margins and protective distance, watch lightning surges reflect in 4D and check IEC 61936 clearances. Free interactive lab.

HV Testing & Commissioning Lab HV-511

Simulate HV tests: insulation resistance, VLF and tan delta, TDR, transformer TTR, CT knee point, CB timing and relay injection, then print test sheets.

HV Safety & Switching Operations Lab HV-512

Practise HV switching programs, calculate arc flash energy and PPE, see approach boundaries in 3D, follow permit and LOTO flows and size portable earths.

Asset Management & Diagnostics Lab HV-514

Interpret transformer DGA on a Duval triangle, estimate insulation ageing, grade thermography and PD results and build an asset health index. Free lab.

Primary Substations & GIS Lab HV-515

Compare busbar schemes in 4D, GIS vs AIS footprint, SF6 density and leakage, N-1 transformer capacity and a 3D GIS bay for 66 to 132 kV substations.

HV Question Bank & Case Studies HV-516

145 high voltage engineering questions with explanations, timed exams, scored failure case studies and interview and CPEng preparation. Free and interactive.

HV Installation & Site Works Lab HV-517

Calculate cable pulling tension and sidewall pressure, plan trenches and transformer lifts, follow an 11 kV joint step by step and test earth rods in 3D.

Medium Voltage Labs (17 modules)

Sixteen labs for 6.6 kV to 33 kV building and campus networks, plus a 788-question MV bank. Open the Medium Voltage Engineering Hub โ†’

MV Systems & Network Explorer MV-501

Follow power from grid to building in 3D, compare radial, open and closed ring MV networks under fault, and see how each neutral earthing method behaves.

MV Cables & Accessories Lab MV-502

MV XLPE cable lab: 3D cable layers, IEC 60287 rating for 6.6 to 33 kV, voltage drop and short-circuit checks, sheath bonding and a 4D termination sequence.

RMU & MV Switchgear Lab MV-503

Explore an 11 kV ring main unit in 3D, operate the interlocks, play 4D switching sequences and size MV switchgear to IEC 62271-200.

Distribution Transformer Lab MV-504

Oil and cast resin transformers in 3D, animated Dyn11 vector groups, parallel operation, kVA sizing, losses, LV fault level and an IEC 60076-7 thermal day.

Substation Design & Layout 3D MV-505

Design an 11 kV building substation or kiosk in 3D: operating clearances, doors, transformer room ventilation, oil containment and fire separation.

Short Circuit & Load Flow Studio MV-506

IEC 60909 short circuit from the 11 kV source to the final DB: three-phase and earth fault levels, peak current, motor contribution and voltage profile.

MV Protection & Relay Coordination MV-507

Plot IEC IDMT relays, HV fuses and LV ACBs on one TCC chart, check grading margins, inrush and damage curves, and size CT knee-point voltage.

MV Earthing & Step/Touch Lab MV-508

Design a substation earth grid to IEEE 80: grid resistance, GPR, mesh and step voltage against tolerable limits, with a 3D surface potential view.

MV Testing & Commissioning Lab MV-509

Virtual MV commissioning tests: IR and PI, VLF withstand and tan delta to IEEE 400.2, transformer ratio and winding resistance, relay secondary injection.

Renewables, BESS & EV MV Integration MV-513

Simulate a day of PV, battery storage and EV charging behind an 11 kV connection: peak demand, reverse power, transformer loading and voltage rise.

4D Substation Project Simulator MV-516

Capstone MV project: estimate load, size transformer, RMU and 11 kV cable, lay out the room, then get a BOQ, cost estimate and a 4D programme.

MV Question Bank & Practice Exams MV-517

788 medium voltage (11, 22 and 33 kV) multiple choice questions with answers and explanations. Practise by module, level and region or sit a timed exam.

ELV & BMS Modules (10 modules)

Home Automation Virtual Control Lab ELV-301

KNX, DALI and home automation protocols, control strategies and the commissioning that proves them.

BMS Field Reference ELV-302

BMS architecture, controllers, field devices, point schedules and practical commissioning reference.

CCTV, Access Control & Security ELV-303

Security system architecture, access control, intrusion detection and the interfaces to fire and BMS.

Structured Cabling & Data Networks ELV-304

Copper and fibre cabling, network design, containment, testing and certification.

CCTV Video Surveillance System Lab ELV-305

Camera selection, pixel density and DORI, storage and bandwidth, SIRA requirements and handover records.

Public Address & Voice Alarm (PAVA) ELV-306

PAVA design, zoning, speaker selection, intelligibility and the standards behind each requirement.

Wi-Fi Heat Map Studio ELV-310

Import a floor plan, place access points, draw wall losses and study coverage, interference and PoE budgets.

Access Control System Master Lab ELV-307

Learn access control design: OSDP vs Wiegand, door hardware, maglock voltage drop, PSU and battery sizing, anti-passback, lifts, fire release and SIRA rules.

TV & Media Systems Lab ELV-309

SMATV and IPTV design lab: LNB and multiswitch logic, dish link budget, coax riser designer, spectrum faults, IPTV multicast and RF over fibre budget.

Fire & Life Safety Modules (5 modules)

Fire Alarm System Virtual Lab FA-201

Detection design, loop and addressing, battery calculations and a cause and effect simulator.

Fire Pump & Tank Sizing Lab FF-203

Listed NFPA 20 pump selection, jockey and start set points, motor and diesel sizing, starting kVA, tank volume and a 4D start sequence.

HVAC & Mechanical Modules (12 modules)

FAHU Electro-Mechanical Lab E-118

How a fresh air handling unit works: filters, coils, heat recovery, humidity and controls, shown as a live unit.

Plant Noise Lab HVAC-409

Rooftop plant and generator noise at the boundary: distance, directivity, barriers, dB(A) limits and NR inside rooms.

Plumbing & Drainage Modules (6 modules)

Medical Gas Systems Lab PLB-706

Terminal units by department, diversified flows, medical copper main sizes, VIE, reserve cylinders, compressors and vacuum.

MECHANICAL ยท HVAC ยท PLUMBING ยท FIRE FIGHTING

HVAC, Mechanical & Plumbing modules

Explore how equipment works, run practical calculations and review system design and site decisions.

๐ŸงชHVAC-401 ยท VIRTUAL LABHVAC Virtual Engineering & Diagnostics LabThermodynamics, primary equipment, piping and hydraulics, air distribution, controls and commissioning in 2D, 3D and 4D.Open HVAC-401 โ†—๐ŸงฐHVAC-402 ยท SIMULATORHVAC Equipment & Diagnostics SimulatorFCU, AHU, chiller and VRF units with their wiring and controls, fault finding and commissioning sequences.Open HVAC-402 โ†—๐ŸŒฌ๏ธE-118 ยท INTERACTIVE HVAC LABFAHU Electro-Mechanical LabAirflow, cooling coil and heat recovery linked to fan and DX motor power, the control panel, wiring, BOM and BMS points.Open FAHU lab โ†— โš™๏ธE-110 ยท HVAC SYSTEM TRAININGHVAC Electrical Engineer Training LabWork through HVAC equipment controls, motor starting and operating sequences.Open HVAC training โ†— โ„๏ธE-115 ยท INSIDE THE MEP TOOLBOXHVAC CalculatorsExplore cooling load, duct sizing, ventilation and related calculations in the HVAC tab.Open HVAC calculators โ†— ๐ŸšฟE-115 ยท INSIDE THE MEP TOOLBOXPlumbing & DrainageExplore pipe sizing, drainage and water system calculations in the Plumbing & Drainage tab.Open plumbing calculators โ†— ๐ŸงฏE-115 ยท INSIDE THE MEP TOOLBOXFire Fighting CalculatorsExplore fire protection calculations in the Fire Fighting tab of the toolbox.Open fire fighting tools โ†— ๐Ÿ“šE-119 ยท QUESTION BANKHVAC, Plumbing & Fire Q&ASearch questions by trade and project stage in the MEP knowledge hub.Open knowledge hub โ†—
MODULE GUIDE

Module

MEP VirtualModuleTools & topics

What you can explore

Open this module โ†—