FF-204 · FIRE FIGHTING · SMOKE CONTROL

Smoke Extract & Stair Pressurisation Lab

Three smoke control tools in one: size a stair pressurisation fan with door leakage, open door velocity, door force and relief damper; size atrium smoke exhaust with the NFPA 92 plume equations and plugholing check; and set car park smoke ventilation rates.

BS EN 12101-6NFPA 92UAE Fire & Life Safety CodeBS 7346-7EN 12101-3 F300AS 1668.1

How to use: pick a tool below. Defaults are set for a typical Gulf project, and every field has an i with a plain explanation.

1. Stair and doors

Pressure differential system for an escape or fire fighting stair.

Criteria
Building

2. View

3. Checks

    4. Calculation

    5. How the methods work

    Stair pressurisation

    Air leaks out through door gaps and wall cracks at Q = 0.83 × A × √ΔP (m³/s, m², Pa). With all doors shut the fan must hold the design pressure against that leakage. With doors open it must push air through them fast enough to keep smoke out. The bigger of the two sets the fan, plus duct leakage. When the doors shut again the surplus must escape through a relief damper so the doors can still be opened: F = closer force + W × A × ΔP / (2 (W − d)).

    Atrium plume

    NFPA 92 gives the smoke mass flow rising past height z in an axisymmetric plume: m = 0.071 Qc1/3 z5/3 + 0.0018 Qc, with Qc = 0.7 Q. Exhausting that mass at the layer temperature holds the smoke at height z. Each inlet can only take so much before it pulls clear air through the layer (plugholing), so the lab works out how many inlets you need.

    Smoke filling time

    Without extract, the layer falls as the plume fills the space. The NFPA 92 filling equation gives the layer height against time, which the 4D view plays back.

    Car parks

    Conventional systems use about 10 air changes per hour in fire mode and 6 for normal pollution control, with fans rated for 300 °C for 2 hours. Impulse fan layouts are confirmed by CFD.

    Learning and checking tool. Smoke control designs need the project fire strategy, the authority's approval and, for atria and car parks, usually CFD.

    Quick summary in your language

    Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

    This lab sizes stair pressurisation fans and relief dampers, atrium smoke exhaust and car park smoke ventilation. Check the door opening force, because people must be able to open the stair door.

    About this lab: Smoke Extract & Stair Pressurisation Lab

    Smoke Extract & Stair Pressurisation Lab

    Size stair pressurisation fans, door forces and relief dampers to EN 12101-6 and NFPA 92, atrium smoke exhaust with plume and plugholing checks, and car park smoke ventilation.

    Topics you can explore

    • Pressure differential classes A, B and C
    • Door gap leakage and Q = 0.83 A √ΔP
    • Door opening force
    • Relief dampers
    • NFPA 92 axisymmetric plume
    • Plugholing
    • Smoke filling time
    • Car park smoke clearance rates

    Practical engineering example

    A 20 floor residential stair to EN 12101-6 Class A with single leaf doors and 25% unidentified leakage needs about 2.2 m³/s to hold 50 Pa with doors shut, and 2.4 m³/s with the fire floor door open at 0.75 m/s. With 15% duct leakage the fan is about 2.7 m³/s, and the door force at 50 Pa is 97 N, just inside the 100 N limit.

    Developed by Eng. Mannan Maqsood. Verify against current project requirements and the applicable authority rules.

    Project checks

    Start with the approved smoke-control scenarios, including door states, fan modes and available relief paths. Check the relevant pressure, airflow and door operation under the prescribed test conditions.

    NEXT STEP

    Where to go from here

    Related labs that pick up where this one ends.

    Fire Pump & Tank Sizing LabPumps, set points and fire water storage.FF-203 →Fire Alarm System Virtual LabCause and effect for smoke fans and dampers.FA-201 →HVAC Virtual Engineering LabFans, ducts and air distribution.HVAC-401 →Standby Generators & Emergency PowerSecondary supply for smoke control fans.E-112 →
    Your work in each lab is saved in this browser.Save or move my progress · All 127 labs · Ask the Copilot