LAB AT A GLANCEHVAC-401Ask the Copilot about this lab →
Codes & standards 42
EN 378ASHRAE 15ASHRAE 90.1AS/NZS 5149ISO 5149IEC 60335-2
+36 more
ASHRAE 34AS/NZS 3000ASHRAE 62.1EN 378-1ISO 817ASHRAE 55EN 14825EN 378-3EN 14511EN 15978IEEE 1584AS 1668AS 1668.2EN 308EN 1886EN 13053EN 1397ISO 16358EN 15804CIBSE Guide MNFPA 70EBS 7671AS/NZS 4836ISO 14118ISO 13857AS 2865ASHRAE 188AS/NZS 3666AS/NZS 5601NFPA 54ISO 9612ISO 11228NFPA 92NFPA 4BS 9999AS 1851
Regions 7
DubaiAbu DhabiSaudiQatarAustraliaNew ZealandInternational
Views
2D3D4D5D
Q&A508 HVAC questions →Site cases77 HVAC site cases →

MEPVirtual

HVAC-401

Virtual Engineering & Diagnostics Lab

Cycle lab Design Library 6D-8D Project

Operating inputs

The grid factor is an example value only. Replace it with the published grid emission factor for your region.

Energy

Compressor input at design
Annual energy
Cooling delivered per year

Compressor only. Fans and pumps are not included. Part load is a flat factor, not an IPLV/SEER calculation.

TEWI (EN 378-1 method)

Indirect, from electricity
Direct, from leaks
Direct, at end of life
TEWI over life
TEWI with efficiency degradation

GWP is IPCC AR5 100-year. TEWI = GWP·L·n + GWP·m·(1−α) + n·E·β.

Same duty, every refrigerant

Each refrigerant runs at the same evaporating and condensing dew/bubble temperatures, superheat, subcooling and compressor efficiency as the sidebar. Charge is held the same for a fair GWP comparison, though real charges differ.

Quick summary in your language

Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

This lab covers HVAC from thermodynamics and main equipment to piping, air distribution, controls and commissioning, in 2D, 3D and 4D. Pick a topic, change the inputs and watch the system respond.

Project checks

Set the climate, use and occupied condition before calculating loads or air quantities. Verify ventilation, energy and equipment assumptions separately so a cooling result is interpreted in the correct design context.

NEXT STEP

Where to go from here

Related labs that pick up where this one ends, and a learning path to follow.

HVAC Equipment & Diagnostics SimulatorSimulate HVAC equipment, wiring, controls and fault finding: FCU, AHU, chillers and VRF.HVAC-402 →Cooling Load & Duct Static Pressure LabFree HVAC design trainer: room cooling load with walls, glass, solar, people, lights, equipment.DES-603 →FAHU Electro-Mechanical LabExplore how a fresh air handling unit works, including filters, heat recovery, cooling coils.E-118 →Design Engineering TrackCodes, symbols, loads, cable sizing, drainage and calc sheets in 6 labs.LEARNING PATH →
Your work in each lab is saved in this browser.Save or move my progress · All 127 labs · Ask the Copilot