HV-510 · HV ACADEMY

Generation & Renewables Interconnection Lab

Synchronise a generator with a live synchroscope and see what happens if you close out of phase. Push the generator around its capability chart, find how much PV a feeder can host before the voltage rises too far, open the grid breaker and watch loss-of-mains protection react, size a capacitor bank, and run a 3D hybrid plant through its operating modes. Click any for a plain-language explanation.

SynchronisingCapability chartVolt-varRoCoFIEEE 1547AS/NZS 4777DRRG

1. Plant and network data

Pick your region first. It loads frequency, connection voltage, a typical fault level and the voltage rise limit. Replace them with the network operator's values.

Click any part of the plant
Pick an operating mode to see where the energy flows. The PCC breaker turns red in island mode.

Quick summary in your language

Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

This lab shows how generators and solar or battery plants connect to the grid: synchronising, voltage rise and loss-of-mains protection. Never close onto the grid until voltage, frequency and phase match.

Engineer's Notes: connecting generation

Every connection is a study

A generator, PV plant or battery changes fault levels, voltages, protection and power quality on the network. Network operators ask for connection studies before approval, and the requirements grow with the size of the plant.

Synchronising is a skill

Closing a generator breaker out of phase can push several times rated current through the machine and damage the shaft and coupling. Check-synchronising relays and auto-synchronisers prevent it, but operators still need to understand what they are watching.

Voltage rise limits solar

On long or weak feeders, voltage rise usually limits how much generation can connect before thermal ratings do. Volt-var control, curtailment and stronger connections increase hosting capacity.

Never feed a dead network

Loss-of-mains protection, inverter anti-islanding, intertrips and interlocked changeovers all exist for one reason: generation must not keep a network live that people believe is dead.

Frequently asked questions

What conditions must be met before closing a generator onto the grid?

Voltage, frequency and phase angle must match closely, and the phase sequence must be correct. A typical check-synchronising window is within 5 % voltage, 0.1 Hz and 10 degrees, with the generator running slightly fast so it picks up load when the breaker closes.

Why does distributed generation cause voltage rise?

Exported power flows back along the feeder towards the substation, and the voltage drop across the feeder resistance and reactance reverses into a rise, roughly (P x R + Q x X) / V squared. Absorbing reactive power or curtailing output reduces it.

What is islanding and why is it dangerous?

Islanding is when generation keeps supplying part of the network after the utility supply has been disconnected. Line crews may find a supposedly dead circuit live, and reclosing onto an out-of-phase island can damage equipment. Loss-of-mains protection and inverter anti-islanding must disconnect the generation, usually within 2 seconds.

What is a volt-var curve?

An inverter control setting that makes the inverter absorb reactive power when its voltage is high and supply reactive power when it is low. AS/NZS 4777.2 and IEEE 1547 define default curves that help keep feeder voltages within limits as more solar connects.

How do I check a capacitor bank for harmonic resonance?

Estimate the parallel resonance order as h = sqrt(Ssc / Qc), where Ssc is the fault level and Qc the bank size. If h is close to 5, 7, 11 or 13, harmonic currents can be amplified, so use a detuned bank with a series reactor.

Topics: synchronising · synchroscope · check-sync relay · capability chart · excitation · voltage rise · hosting capacity · volt-var · volt-watt · short-circuit ratio · loss of mains · RoCoF · anti-islanding · intertrip · NVD · BESS · PV inverter · capacitor bank · resonance · DRRG · AS/NZS 4777 · Part 6 · IEEE 1547

Related labs

Project checks

Define the point of interconnection and how generation behaves during utility disturbances. Review the applicable utility protection, export and commissioning requirements for the proposed technology.

NEXT STEP

Where to go from here

Related labs that pick up where this one ends.

HV Academy hubAll 17 high voltage labs in one learning path.HV ACADEMYInsulation Coordination & Surge LabSelect surge arresters, check LIWL margins and protective distance, watch lightning surges reflect in 4D and…HV-509 · previousHV Testing & Commissioning LabSimulate HV tests: insulation resistance, VLF and tan delta, TDR, transformer TTR, CT knee point, CB timing…HV-511 · nextRenewables, BESS & EV MV IntegrationSimulate a day of PV, battery storage and EV charging behind an 11 kV connection: peak demand, reverse power,…MV-513 · MV view
Track what you have opened on My progress.All labs → · Ask the Copilot →