Cooling Load & Duct Static Pressure Lab

The two calculations every junior HVAC designer is asked for first: how much cooling does this room need, and how much pressure must the fan make to deliver it. Build the load piece by piece, watch it change through the day, then size the ductwork and add up the index run.

Design conditions

Every load calculation starts with outdoor and indoor design conditions. Pick a city preset (typical values) or enter your project's design basis.

Location preset

Presets are typical summer design values for learning. Use the values in your project design basis or the authority's requirements.

Outdoor

Indoor

Room cooling load

Describe the room. The peak-hour load updates as you type, with each component shown. Tap , or for plain explanations.

Room

Facades

Internal gains & ventilation

Load breakdown at peak hour

Working

4D hourly peak and 3D sun

The same room from 06:00 to 20:00. Play the day: the sun moves, the sunlit facades heat up, and the chart shows when the room peaks.

Drag to rotate · tap a facade
06:00

Supply air and psychrometrics

The sensible load sets the supply airflow. The latent load and the outdoor air set how much moisture the coil must remove.

Psychrometric states

Mini psychrometric chart

Working

Duct sizing by equal friction

An AHU serves several rooms like this one through a trunk with three tees and six diffusers. Set the friction rate and velocity limits; each section is sized automatically.

Layout (plan)

Index runOther sections

Section schedule

Static pressure and fan selection

The fan must overcome the index run on the supply side, the return side and the AHU's own components. Edit the allowances to match the AHU data.

AHU internal and return allowances (Pa)

Result

Index run breakdown

3D ductwork

The sized network in 3D. Colour shows velocity; the index run glows amber. Tap any section.

Drag to rotate · scroll or pinch to zoom · tap a duct
< 4 m/s4–6 m/s6–8 m/s> 8 m/s

Engineer's notes

Lessons from real design reviews.

Quiz

Score 0

Plain-language explainer

Term

Quick summary in your language

Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

This lab works out the cooling load of a room hour by hour, then sizes the ducts and the fan pressure. Check the sun, people and equipment loads, then follow the index run to the fan.

About this lab: Cooling Load & Duct Static Pressure Lab

Cooling Load and Duct Static Pressure for HVAC Designers

This free lab teaches the core HVAC design calculations with every step shown: heat gains, the hourly peak, supply airflow, duct sizing by equal friction, and the external static pressure for fan selection.

What the lab covers

  • Conduction through walls, roof and glass with simplified sol-air and time lag
  • Solar gain through glazing using SHGC and orientation
  • Internal gains from people, lighting and equipment
  • Outdoor air sensible and latent loads from psychrometrics
  • Duct friction by Darcy-Weisbach and Colebrook, fittings by velocity pressure
  • Index run, AHU internal losses, fan power and specific fan power

What makes up a room cooling load?

Heat conducted through walls, roof and glass, solar radiation through glass, heat from people (sensible and latent), lighting and equipment, and the outdoor air brought in for ventilation. The peak usually happens in the afternoon for west-facing rooms and in the morning for east-facing rooms.

How do you get supply airflow from the cooling load?

Divide the room sensible load by 1.23 × (room temperature − supply air temperature). For a 10 kW sensible load with 24 °C room and 13 °C supply, the airflow is about 10,000 ÷ (1.23 × 11) ≈ 740 L/s.

What is the equal friction method?

Each duct section is sized so that its friction loss per metre is about the same (often around 0.8 to 1 Pa/m), within velocity limits for noise. It is simple and widely used for low velocity supply systems.

What is the index run?

The path from the fan to the terminal with the highest total pressure loss. The fan must overcome it, so the external static pressure is based on the index run plus the return side.

Developed by Eng. Mannan Maqsood. This lab uses a simplified hourly method for learning and early sizing. Final designs use the project's approved load software and the manufacturer's data.

Project checks

Compare the design cooling load with selected equipment capacity and evaluate duct resistance along the critical path. Check the conditions used in the load, fan and ventilation calculations before aligning the schedules.

NEXT STEP

Where to go from here

Related labs that pick up where this one ends, and a learning path to follow.

Cable Sizing, Voltage Drop & Lighting LayoutFree electrical design trainer: design current, derating for ambient, grouping and insulation.DES-604 →FAHU Electro-Mechanical LabExplore how a fresh air handling unit works, including filters, heat recovery, cooling coils.E-118 →HVAC Virtual Engineering & Diagnostics LabWork through HVAC thermodynamics, primary equipment, piping and hydraulics, air distribution.HVAC-401 →Site Engineering TrackInstallation, inspection, submittals, snags and testing in 6 labs.LEARNING PATH →
Your work in each lab is saved in this browser.Save or move my progress · All 127 labs · Ask the Copilot