HVAC-405 · HVAC · VRF SYSTEMS

VRF Refnet & Pipe Length Checker

Build a VRF piping tree from the outdoor unit through the refnet joints to every indoor unit. The lab sizes each pipe from the capacity downstream, checks the length and height limits and the connection ratio, adds up the refrigerant charge and tests the smallest room against the EN 378 concentration limit.

EN 378ISO 5149ASHRAE 15AS/NZS 5149R410AR32

How to use: edit the piping table: each row is a pipe ending at a refnet joint or an indoor unit. Limits default to typical manufacturer values, so set them to your brand's figures. Tap i for explanations.

1. Outdoor unit and limits

Limits differ by manufacturer and model. Check the installation manual.

Outdoor unit
Piping limits

2. Piping tree

Liquid and gas sizes on every pipe. Red items break a limit.

3. Checks

    4. Piping table

    Type R is a refnet joint, type U an indoor unit. Height is relative to the outdoor unit (negative is below). Room volume is the smallest room the indoor unit serves.

    5. How the checks work

    Pipe sizes

    Each pipe is sized from the total indoor capacity downstream of it, using a typical R410A sizing table. Manufacturers publish their own tables and some upsize the main pipe for long runs, so always confirm with the brand's design software.

    Lengths and heights

    Equivalent length adds about 15% for bends and 0.5 m per refnet joint to the actual length. The longest run, the run from the first joint and the height between units all have limits because oil return and refrigerant pressure drop get worse with distance and lift.

    Connection ratio

    Total indoor capacity divided by outdoor capacity. Diversity lets you connect more indoor capacity than the outdoor unit can deliver at once, typically up to 130%, but the units then share capacity at peak.

    Refrigerant in small rooms

    If the whole charge leaked into the smallest room, the concentration must stay within the limit. For R410A EN 378 uses a practical limit of 0.44 kg/m³. For R32, which is mildly flammable, the limit depends on room floor area and unit height: mmax = 2.5 × LFL1.25 × h0 × √A. If a room fails, add a leak detector with shut-off valves, ventilation, or split the system.

    Learning and checking tool. Final design must follow the manufacturer's installation manual and selection software.

    Quick summary in your language

    Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

    This lab checks a VRF piping layout: pipe sizes, length and height limits, connection ratio and refrigerant charge. Check the refrigerant concentration in the smallest room for safety.

    About this lab: VRF Refnet & Pipe Length Checker

    VRF Refnet & Pipe Length Checker

    Check a VRF piping tree: pipe sizes from downstream capacity, length and height limits, connection ratio, refrigerant charge and the EN 378 small room limit for R410A and R32.

    Topics you can explore

    • Refnet joints and headers
    • Pipe sizes by capacity
    • Actual and equivalent length
    • Height limits
    • Connection ratio
    • Additional refrigerant charge
    • EN 378 and R32 room limits

    Practical engineering example

    A 45 kW rooftop VRF serving five office units runs at 96% connection ratio with about 115 m of pipe. Adding about 9 kg to the 11.8 kg factory charge gives roughly 21 kg of R410A, more than the 16.7 kg a 38 m³ manager office can take, so that room needs leak detection or its own system.

    Developed by Eng. Mannan Maqsood. Verify against current project requirements and the applicable authority rules.

    Project checks

    Check the actual VRF equipment combination, equivalent lengths, height differences and branch fittings against the selected manufacturer. A route that fits the building can still fall outside equipment limits.

    NEXT STEP

    Where to go from here

    Related labs that pick up where this one ends.

    HVAC Equipment SimulatorVRF wiring, controls and fault finding.HVAC-402 →Duct Sizing & Fan Static LabDucted indoor units and fresh air.HVAC-403 →HVAC Virtual Engineering LabRefrigeration cycle and plant in 3D.HVAC-401 →Clash Detection LabRoute refrigerant pipes with other services.E-121 →
    Your work in each lab is saved in this browser.Save or move my progress · All 127 labs · Ask the Copilot