HVAC-403 · HVAC · AIR DISTRIBUTION

Duct Sizing & Fan Static Pressure Lab

Lay out a supply duct tree, size every section by equal friction with velocity limits, convert to rectangular sizes that fit your ceiling void, and find the index run and fan static pressure. Then watch the system balance as the dampers are set.

ASHRAE FundamentalsCIBSE Guide CSMACNADubai Green Building RegulationsAS 4254.2Darcy-Weisbach

How to use: edit the sections table (flows go on the terminal sections only), set your friction rate and void depth, and the sizes update. Tap i for plain explanations.

1. Design criteria

Typical values for offices and hotels are preset.

Sizing
Fan and plant

2. Duct layout

Width shows duct size, colour shows velocity. The index run is outlined in orange.

3. Checks

    4. Sections

    Edit names, parent, length, fitting loss coefficients and terminal flows. Upstream flows add up automatically.

    5. How the sizing works

    Equal friction

    Each section gets the smallest standard round size whose friction loss is at or below the target, and whose velocity is within the limit for mains or branches. 0.8 to 1.0 Pa/m is a common target for low velocity systems in offices and hotels.

    Friction

    Pressure loss per metre is Darcy-Weisbach: Δp/L = f / D × ρV²/2, with the friction factor from the Altshul-Tsal form of Colebrook, which ASHRAE uses for duct design.

    Rectangular ducts

    A rectangular duct carries the same flow at the same friction as a round duct of equivalent diameter De = 1.30 (ab)0.625 / (a + b)0.25. The lab keeps the depth within your ceiling void and works out the width, flagging aspect ratios above 4 to 1.

    Index run and fan static

    Every path from the fan to a terminal adds friction, fitting losses (C × ρV²/2) and the terminal pressure. The highest is the index run. Fan static is the index run plus the AHU internal losses, the return path and a margin. Shorter runs have pressure to spare, which their volume control dampers must take up at commissioning.

    Learning and checking tool. Final duct design should be checked in your design software against the manufacturer data for terminals, fittings and the AHU.

    Quick summary in your language

    Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

    This lab sizes supply ducts by equal friction, converts them to rectangular sizes for the ceiling void and works out the fan static pressure. Keep velocities within limits to avoid noise.

    About this lab: Duct Sizing & Fan Static Pressure Lab

    Duct Sizing & Fan Static Pressure Lab

    Size a supply duct tree by equal friction with velocity limits, convert to rectangular sizes for your ceiling void, find the index run, fan static, fan power and balance.

    Topics you can explore

    • Equal friction method
    • Velocity limits and noise
    • Darcy-Weisbach and Altshul-Tsal friction
    • Fitting loss coefficients
    • Rectangular duct equivalent diameter
    • Index run and fan static
    • Specific fan power
    • Balancing with dampers

    Practical engineering example

    An office floor with 2,350 L/s from one AHU sizes to a 1,100 × 400 mm main at about 6 m/s. The index run to the reception branch is about 95 Pa, so with 450 Pa AHU losses, 80 Pa return and a 10% margin the fan needs about 690 Pa and absorbs about 2.7 kW.

    Developed by Eng. Mannan Maqsood. Verify against current project requirements and the applicable authority rules.

    Project checks

    Evaluate the critical duct route with its fittings, equipment and terminal losses. Confirm the measurement conditions and fan selection basis before comparing design static pressure with a field result.

    NEXT STEP

    Where to go from here

    Related labs that pick up where this one ends.

    Cooling Load & Duct Static LabStart from the room cooling load.DES-603 →HVAC Virtual Engineering LabAHUs, chillers and controls in 3D.HVAC-401 →FAHU Electro-Mechanical LabFresh air units, fans and coils.E-118 →Clash Detection LabFit ducts around trays and pipes.E-121 →
    Your work in each lab is saved in this browser.Save or move my progress · All 127 labs · Ask the Copilot