Codes & standards 3
AS/NZS 3500.1BS EN 806BS EN 806-3
Regions 4
DubaiAustraliaNew ZealandInternational
Views
2D3D4D
Q&A506 Plumbing questions →Site cases46 Plumbing site cases →
PLB-701 · PLUMBING · COLD WATER

Water Demand & Booster Pump Lab

Count the fixtures, convert them to water supply fixture units and a probable peak flow with the Hunter curve, then size the booster set: pressure zones that keep every outlet between the minimum and maximum pressure, pump duty, power and the riser size. Play a day of demand to see how the pumps stage.

IPC Appendix EUPCDubai Building CodeBS EN 806AS/NZS 3500.1NZBC G12

How to use: enter fixtures per typical floor and the number of floors. Fixture unit values are typical IPC figures you can edit. Tap i for explanations.

1. Building and fixtures

Fixtures per typical floor, all floors alike.

Building
Fixtures per floor
Pressure and pumps

2. Pressure zones

Static pressure on every floor with zones and pressure reducing valves marked.

3. Checks

    4. Demand and zones

    5. How it works

    Fixture units and the Hunter curve

    Every fixture gets a water supply fixture unit (WSFU) value reflecting how much and how often it draws. The total does not add up linearly: the chance of all taps running at once falls as the number grows. The Hunter curve turns total fixture units into a probable peak flow, which is what pipes and pumps are sized for.

    Pressure zones

    Every outlet needs enough pressure to work (shower mixers about 1 to 1.5 bar, flush valves more) and no more than the maximum (5 bar in AS/NZS 3500.1 and common UAE practice) to avoid noise, splashing and wear. Height adds 0.0981 bar per metre, so a tall building is split into zones, each with its own pump set or pressure reducing station.

    Booster set

    Variable speed booster sets with several pumps cover the peak with one standby and run one small pump most of the day. Pump power is flow × head / efficiency.

    Learning and checking tool. Use the fixture values and method your authority adopts, for example the Dubai Building Code, IPC, BS EN 806-3 or AS/NZS 3500.1.

    Quick summary in your language

    Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

    This lab turns fixtures into peak water flow, then sizes booster pumps, pressure zones and pressure reducing valves for a tall building. Keep outlet pressure within limits on every floor.

    About this lab: Water Demand & Booster Pump Lab

    Water Demand & Booster Pump Lab

    Turn fixtures into fixture units and a probable peak flow with the Hunter curve, then size booster pumps, pressure zones, PRVs and risers for a high rise building.

    Topics you can explore

    • Water supply fixture units
    • Hunter curve
    • Minimum and maximum outlet pressure
    • Pressure zones
    • Pressure reducing valves
    • Booster pump sets with VSD
    • Riser velocity

    Practical engineering example

    A 30 floor residential tower with six WCs, six basins, four showers, two baths and three kitchen sinks per floor adds up to about 1,430 fixture units, or about 16.5 L/s on the Hunter curve. Keeping outlets between 1.5 and 5 bar means three pressure zones of ten floors, and the top zone pumps need about 118 m of head.

    Developed by Eng. Mannan Maqsood. Verify against current project requirements and the applicable authority rules.

    Project checks

    Compare demand and pressure at representative high and low fixtures before selecting a booster duty. Check the source pressure, controls and low-flow behaviour as well as the peak flow estimate.

    NEXT STEP

    Where to go from here

    Related labs that pick up where this one ends.

    Fixture Units & Drainage Slope LabBeginner fixture units and drainage.DES-605 →Fire Pump & Tank Sizing LabFire pumps next to the booster set.FF-203 →Chilled Water Pipe Sizing LabSame pipe sizing logic for CHW.HVAC-404 →Clash Detection LabRoute risers with other services.E-121 →
    Your work in each lab is saved in this browser.Save or move my progress · All 127 labs · Ask the Copilot