Electrical Design Tools & UAE Regulations Reference

Cable & Breaker Selector (DEWA) + Independent Regulations Reference (DEWA / SEWA / Abu Dhabi / EtihadWE)
Selector tools reference DEWA Appendices 5, 9 & 10 (cable, ECC & RCD sizing tables).
Regulations tab is an independently written summary, not a reproduction of any authority's clause text.

Cable, Breaker & Load Selector

Direct lookup from DEWA Appendix 5 (Tables 1–3) - set any one value and the matching cable size, MCB/MCCB rating and max load current follow, per the standard selection table. Not a calculated/interpolated value - DEWA's tables are discrete rows, so results snap to the nearest listed size. ECC (Appendix 9) is derived from the selected phase conductor size.

Load kW → DEWA Cable & Breaker Selection

Enter the connected/design load. The tool converts kW to current and then selects the next suitable row from the active DEWA Appendix 5 cable/breaker table. The selected table above remains the governing cable type.

Calculated Load Current
-
Recommended Breaker
-
Recommended Cable
-

RCD / ELCB operating current - Appendix 10

Recommended operating current by circuit/equipment type. Match this to whatever circuit the cable/breaker above is feeding.

Notes carried over from Appendix 5:
  1. Assess initial demand with safe diversity and anticipated future demand before finalising cable size and breaker rating.
  2. Assess individual fault levels and select MCB/MCCB accordingly - this table does not account for fault-current withstand.
  3. Refer to manufacturer catalogues for specific applications, considering inductive/capacitive loads, laying conditions, voltage drop and correction factors (grouping, ambient, depth of burial).
About this lab: DEWA Electrical Design Tools & UAE Wiring Reference

DEWA Electrical Design Tools & UAE Wiring Reference

Explore UAE electrical design tools for loads, cables, breakers and protection, with DEWA reference notes and practical engineering checks.

Topics you can explore

  • DEWA cable sizing
  • Electrical load calculation UAE
  • UAE wiring regulations

Practical engineering example

For a three-phase load, start with supply voltage, power factor and demand. Use the design tool to explore cable and breaker selection, then verify the authority basis.

Developed by Eng. Mannan Maqsood. Verify design outputs against current project requirements and the applicable authority and manufacturer data.

© 2026 Eng. Mannan Maqsood | Engineering Excellence Through Interactive Labs

VERIFY ALL FIGURES AGAINST CURRENT MANUFACTURER DATASHEETS AND LOCAL AUTHORITY REQUIREMENTS BEFORE DESIGN SIGN-OFF.