Electrical + ELV Codes & Standards Virtual Lab
Choose a real system, material or device. See where it is used, which standard applies, what to verify and how it is tested.
Single-line system map
Engineer workflow
Quick links
Equipment & Material Library
Major LV equipment, protection, wiring and accessories - one product/assembly standard shown per card. Installation, IP and related standards live in the Standards Finder.
Manufacturer / factory certifications - why these matter
Containment & Installation Accessories
Click an item. The panel shows what an engineer should physically inspect on site.
GI Conduit
Conduit fill (visual only)
Support spacing check
What to look for on site
Installation Tools & Test Instruments
What it is, where it's used, and what it verifies.
Fire Alarm & Life Safety
Device library + cause & effect simulation. Test the approved cause & effect, not only individual devices.
Fire alarm code basis - keep the roles separate
Typical Devices
Virtual Cause & Effect
Press ALARM and watch the chain.Emergency Lighting & Central Battery
Visualize normal supply failure and emergency operation.
Emergency lighting code basis
Normal → Failure → Emergency
Check the approved emergency-lighting layout, maintained/non-maintained operation, monitoring, battery autonomy and required illumination against the project and authority criteria.
ELV Systems
Devices, common interfaces, cabling and tools for each ELV system.
ELV review approach
Switchgear & Busbar - Design Verification (IEC 61439)
Choose the assembly, trace the evidence against the report, and record the gaps. Field guide only - final sign-off remains with the responsible engineer.
1 · Identify the proposed assembly
Different original and assembly manufacturers can be legitimate. Trace the design owner's instructions, authorized construction and responsibility for deviations.
2 · Component map
3 · Numerical / identity screen
Example uses an AC assembly with Icw/Ipk declarations. For conditional short-circuit rating Icc, obtain the exact protective device, settings, prospective fault and limitation evidence - this screen does not evaluate that route.
| Parameter | Status | Action |
|---|
4 · Trace the evidence
5 · Factory → site
Busbar thermal (illustrative)
Fault withstand (illustrative)
kAIP rating reference
Blank design-verification certificate - what to read
A logo or certificate title alone is not enough. The evidence must cover the exact product and project requirement.
Standards Finder
Search by equipment, standard number or subject. Click a code for its scope, key requirements and evidence to request.
| Equipment / item | Standard | Review focus |
|---|
Register covers the equipment in this lab, not every electrical standard worldwide. Summaries are review aids, not the full copyrighted standards. Confirm the adopted edition and local authority requirements.
Engineer’s Notes
Practical checks to keep beside the formal standard. Click a card to open it.