Codes & standards 52
ASHRAE 62.1BS 7671NFPA 13BS 5839-1AS 1668.2AS/NZS 3000
+46 more
ASHRAE 90.1IEC 60364BS EN 12464-1BS EN 806BS EN 12845AS 2118.1NFPA 72BS 5266-1ASHRAE 55ASHRAE 15AS/NZS 3008.1AS/NZS 3500AS 1670.1AS/NZS 3080NFPA 90ANFPA 20IEC 61439BS EN 1838NFPA 25NFPA 110BS EN 12056-2CIBSE GBS EN 12056BS 9999BS 9991BS EN 50173BS EN 62676AS 1668.1AS/NZS 1668NZS 4541NZS 4512IEC 11801CIBSE Guide CNFPA 101BS EN 60204BS 5839-6CIBSE Guide ANFPA 70NFPA 14BS 8558AS/NZS 3500.1ASHRAE 34IEC 61439-1IEC 60947-2IEC 60364-5IEC 62305
Regions 9
DubaiAbu DhabiSharjahN. EmiratesSaudiQatarAustraliaNew ZealandInternational
Views
3D4D
Q&A502 coordination questions →Site cases20 Coordination site cases →
DES-601 Design Engineering Track · Phase 1: Fundamentals & codesDesign Engineering Track: 1 of 6

Codes & Authority Rules Navigator

Every design calculation starts with a question: which rule applies here? This lab maps the authorities and codes MEP designers use in the GCC, the UK, Australia and New Zealand, shows how they stack, and trains you to pick the right document and settle conflicts between them.

The code hierarchy

Design documents stack in layers. Higher layers are mandatory; lower layers fill in the detail. Click a layer to see what lives there and how it is used.

Code or standard? A is adopted by law or an authority and says what must be achieved. A gives methods and values, and becomes mandatory when a code, authority or contract calls it up.

Authority navigator

Pick a region and a discipline. The card shows who approves the design, the main documents they enforce and what you normally submit. Names are current to the best of our knowledge; editions change, so check before you rely on one.

Region

Discipline

Which code answers it?

Real design questions. Pick the document you would open first.

Order of precedence

Documents disagree more often than you would think. Decide which requirement governs in each case.

A typical contract order of precedence

    Your contract's conditions define the actual order. Authority regulations sit above all of it because they are law.

    Design compliance checker

    Enter a few values from your design. Each check shows the reference value, where it comes from, and lets you override it with the local authority or specification value.

    3D code map and 4D approval route

    Tap any system in the building to see the codes that govern it for the selected region. Play the 4D timeline to follow a typical approval route from design to completion certificate.

    Drag to rotate · scroll or pinch to zoom · tap a system
    M0

    Engineer's notes

    Lessons from real design reviews.

    Quiz

    Score 0

    Plain-language explainer

    Term

    Quick summary in your language

    Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

    This lab shows which code or authority rule answers each design question, and in what order they apply in each region. Use it to check a design against the right rule before you submit it.

    About this lab: Codes & Authority Rules Navigator

    MEP Codes and Authority Rules for Design Engineers

    This free navigator explains which authority and which code governs each part of an MEP design in the UAE, Saudi Arabia, Qatar, the UK, Australia and New Zealand. It is written for graduate design engineers who need to find the right document quickly and understand how documents rank against each other.

    What the lab covers

    • The hierarchy from legislation and authority regulations to standards, the project specification and manufacturer data
    • Electrical, HVAC, plumbing, fire and ELV authorities and key documents by region
    • Which standard answers common design questions
    • Order of precedence and how to resolve conflicts
    • A quick compliance check with cited sources

    Which code applies when the specification and the authority disagree?

    Authority rules are mandatory, so a design must meet them. Where the specification is stricter, the specification also applies because it is part of the contract. In practice you meet the stricter of the two, and raise an RFI where they truly conflict.

    What is the difference between a code and a standard?

    A code is usually adopted into law or by an authority and says what must be achieved. A standard gives methods, tests or values, and becomes mandatory when a code, an authority or a contract calls it up.

    Who approves electrical designs in Dubai?

    DEWA approves electrical connections, load and installations against its regulations, while Dubai Civil Defence approves fire and life safety systems and Dubai Municipality (or the relevant master developer or free zone authority) issues the building permit.

    Where do I find minimum outdoor air rates?

    ASHRAE 62.1 is widely used in the GCC and internationally. The UK uses Building Regulations Approved Document F and CIBSE guidance, and Australia uses AS 1668.2 through the NCC. Local codes can set their own values.

    Developed by Eng. Mannan Maqsood. Codes are revised regularly. Always check the current edition named by the authority and the project specification before using any value.

    Project checks

    Start a code review by identifying the approving authority and the adopted document edition. Record the applicable clause and its evidence so the designer can trace decisions when the scope changes.

    NEXT STEP

    Where to go from here

    Related labs that pick up where this one ends, and a learning path to follow.

    Symbols, Legends, SLD & P&ID ReaderFree interactive trainer for reading MEP drawings: electrical, fire, HVAC, plumbing.DES-602 →UAE, NZ & Australia Engineering RegulationsCompare electrical authority and standards references for the UAE, Australia and New Zealand.E-109 →MEP Design Basis & Authority Workflow LabLoad estimation, transformer and substation sizing, voltage drop, short circuit.E-129 →Site Engineering TrackInstallation, inspection, submittals, snags and testing in 6 labs.LEARNING PATH →
    Your work in each lab is saved in this browser.Save or move my progress · All 127 labs · Ask the Copilot