E-131 Switchgear & Power Distribution · Lighting

Facade & Architectural Lighting Lab

Lay out LED runs on a building facade, size the power supplies, check DC and mains voltage drop, address the DMX512 network and see the building lit at night in 3D. Then play the evening show from dusk to midnight and watch the power, energy, cost and carbon add up. Every number is calculated from your inputs, every step is shown, and every explains the idea in plain words.

Start here: how a facade lighting system fits together

New to facade lighting? Every and every dotted term opens a short plain-language explanation. Follow the tabs in order the first time. A demo project is already loaded, so every tab shows real results straight away.

Two things travel to every LED fitting: power (mains → breaker → power supply → low-voltage cable → LEDs) and data (controller → DMX512 cable → decoders → LEDs). This lab designs both, then shows you the result.

The two paths

Project and building

Design criteria (apply to every run)

Suggested route through the lab

  1. Check the fitting library and replace the typical values with your manufacturer's datasheet.
  2. Build the LED runs: choose a fitting, length, feed method and cable. See load, current and voltage drop worked out.
  3. Look at the 2D layout and 3D night view. Red runs fail a check.
  4. Size the power supplies, then the mains circuits and breakers.
  5. Address the DMX512 network and check the data segments.
  6. Check the lighting effect on the wall and the light pollution zone.
  7. Play the 4D show to see energy, cost and CO₂, then export the schedules.

Fitting library

Seven common facade fitting types. All values are TYPICAL placeholders to let the lab run. Replace them with manufacturer data before you rely on any result. Editing a value here updates every run that uses that fitting.

LED runs, load, current and DC voltage drop

A is one continuous line or chain of fittings. Long runs are split into , each with its own from the power supply. Pick a run to edit it and see calculations 1 to 4 worked step by step.

Runs on this facade

Edit run

Worked calculation for the selected run

All runs

2D layout: elevation and plan

The elevation shows the front facade: LED runs, segment breaks, feed points, power supply (PSU) locations, cable routes and the from the controller. The plan shows ground-mounted fittings and their aiming. Tap anything to inspect it.

Grid squares are 3 m.
Tap a run, power supply, cable or DMX device to see its details.

3D night view

Drag to rotate, pinch or scroll to zoom, tap a fitting to inspect it. Wall , , and linear outlines are drawn from your runs. Runs that fail voltage drop or maximum run length go red and dim at the far end.

Tap a fitting in the 3D view to inspect it.

Power supply (PSU) and driver sizing

Each segment is fed from a (constant voltage) or a . Segments are packed onto PSUs so that no unit runs above the , then each unit is rounded up to a typical size.

PSU locations

Typical size ranges

Labelled TYPICAL, CHECK MANUFACTURER RANGE. Edit the lists to match the range you are specifying.

PSU and driver schedule

    Worked example: the largest PSU

    Mains circuits, driver inrush and drivers per MCB

    LED drivers draw a very large, very short at switch-on. Put too many on one and it trips every evening. Enter the manufacturer's inrush data, then check each mains circuit for current and against the limits.

    Breaker and supply

    Circuit cable

    Driver inrush data (enter from manufacturer datasheets)

    The default figures are examples only so the lab can run. Manufacturer tables of "drivers per MCB" are written for one breaker type and rating. Re-read the table if you change the breaker.

    Mains circuit schedule

      Worked example: the worst circuit

      DMX512 addressing

      A DMX512 carries 512 . An RGB needs 3 and an RGBW pixel needs 4, so one universe holds 170 RGB or 128 RGBW pixels. The lab counts universes, builds an address map and checks each data line.

      Addressing settings

      Result

      Universe map

      Address map

      Data lines (one universe per DMX512 line)

        Lighting effect on the wall

        How bright will the wall look? A fitting has a in candela. The it makes on the wall falls with the square of distance and with the angle of arrival. The you see depends on the wall's .

        Fitting and aiming

        Helper: estimate candela from lumens

        Results at the aiming point

        Illuminance and luminance up the wall

        Illuminance E (lux)Luminance L (cd/m²)

        Worked calculation

        Light pollution and environmental zones

        Obtrusive light guidance () sorts sites into and sets limits that get tighter after a . This lab does not quote limit values. Enter them from the current edition your authority uses, and the lab checks your design against them.

        Confirm the current edition. Zone definitions and limit values have changed between editions, and some authorities publish their own facade lighting rules. Always read the edition named in your project brief or authority requirements.

        Choose the zone

        Limits from your edition (you enter)

        Your design

        4D show: dusk to midnight with live power and energy

        Press play. The building runs through its evening : fade-in at dusk, architectural white, an event colour show, then dimming steps towards midnight. Power, energy, cost and CO₂ update as the show runs.

        17:30
        Input power (kW)Energy so far (kWh)Scene bands

        Scenes

        Tariff and emissions (you enter)

        Energy per scene

        Worked calculation

        Design checklist

        Tick each item as you check it on your design. Your ticks are saved in this browser. Items are good practice prompts, not clauses from a standard.

        0 of 0 checked

        in plain words (IEC 60529)

        : impact energy (IEC 62262)

        Worked example and formula register

        A complete hand calculation for one run of the current design, from load to energy, using the same numbers as the lab. Change the inputs and this page recalculates.

        Worked example

        Formula register

        Engineer's notes

        Practical lessons from facade lighting projects. Open any note.

        Knowledge check

        Questions on the ideas in this lab. Pick an answer to see whether it is right and why.

        Score 0

        Drag to rotate · pinch to zoom · tap a fitting
        Plain-language explainer

        Term

        Quick summary in your language

        Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

        This lab designs facade and architectural LED lighting: run lengths, voltage drop, drivers, breakers and DMX addressing. Check the voltage drop at the end of each LED run so the colour stays even.

        About this lab: Facade & Architectural Lighting Lab and LED, PSU and DMX calculator

        Facade & Architectural Lighting Lab: LED voltage drop, PSU sizing, DMX512 and lighting effect

        This free facade lighting calculator designs the power and data side of an architectural lighting scheme. It works out the load of linear LED strip, outline profiles, wall washers, grazers, floodlights, pixel dots and uplights, checks the DC voltage drop of every feeder and the strip length per feed against the datasheet maximum, packs segments onto power supplies at a loading factor, and checks the mains circuits for driver inrush and AC voltage drop. It then addresses the DMX512 network, calculates illuminance and luminance on the wall, and plays the evening scene timeline with live energy, cost and CO2.

        What the lab calculates

        • LED load P = W/m x length (or W x quantity) for 12, 24 and 48 V constant voltage and constant current fittings
        • Current I = P / V and DC voltage drop Vd = 2 x L x I x rho / A with end, both-end and mid feed
        • Maximum run length per feed and the longest feeder a cable size allows
        • Constant current driver voltage headroom
        • PSU and driver sizing at a loading factor, rounded to typical sizes
        • Drivers per MCB from manufacturer inrush data, and AC voltage drop to BS 7671 Appendix 4
        • DMX512 channels, pixels per universe (170 RGB, 128 RGBW), universe count, address map and data line checks
        • Illuminance E = I cos(theta) / d squared, beam spot D = 2 d tan(beam/2), luminance L = E rho / pi, and spill past the parapet
        • Environmental zone checks against limits you enter from the current edition
        • Energy per scene, per night and per year, with cost and CO2

        Related labs

        See the CBS & Emergency Lighting Virtual Lab for escape lighting and central battery sizing, the Wiring Diagrams Interactive Lab for DMX512, DALI and 0-10 V control wiring, and the Harmonics & Power Quality Lab for the effect of LED drivers on the supply.

        Project checks

        Review façade lighting for the intended view and the effect beyond the site. Verify the approved controls, exposure, glare or obtrusive-light criteria and product suitability for the installed location.

        NEXT STEP

        Where to go from here

        Related labs that pick up where this one ends, and a learning path to follow.

        CBS & Emergency Lighting Virtual LabCentral battery system and emergency lighting lab: battery sizing, autonomy, circuit voltage drop.E-124 →Cable Sizing, Voltage Drop & Lighting LayoutFree electrical design trainer: design current, derating for ambient, grouping and insulation.DES-604 →Wiring Diagrams Interactive LabInteractive wiring diagrams for lighting, motor control, VFD, BMS, fire alarm, access control.E-128 →Design Engineering TrackCodes, symbols, loads, cable sizing, drainage and calc sheets in 6 labs.LEARNING PATH →