Codes & standards 11
BS 7671AS/NZS 3000IEC 60617IEC 60076-5IEC 60909AS/NZS 61439
+5 more
AS/NZS 3017IEC 60364-6AS/NZS 1102IEC 61439NFPA 20
Regions 9
DubaiAbu DhabiSharjahN. EmiratesSaudiQatarAustraliaNew ZealandInternational
Views
3D
Q&A508 Electrical questions →Site cases4 cases linked to this lab →
Reads DB, SMDB, MDB, busbar and LVP schedules, or the SLD itself

Load Schedule Auditor & SLD Generator

Drop in the Excel load schedule you are about to submit. The tool checks every board, fixes what it can, draws the single line diagrams and builds the documents that normally come after the schedule. Only have the SLD? Upload it as DXF or a readable PDF and the load schedule is built from the drawing, then checked the same way.

CheckBreaker vs cable, RCDs on sockets, phase balance, feeder and MD figures, with a swap list that balances each DB inside its RCD groups.
DrawDetailed SLD set, or the general set for your supply authority in the GCC, Australia, NZ or Asia. PDF, DXF for AutoCAD / DWG, SVG or PNG. Or go the other way: SLD in, load schedule out.
BuildT&C test sheets, BOQ, cable schedule with VD, Zs and fault level, discrimination and kA check, generator and UPS sizing, authority load summary.
Your files stay on your computer. Schedules and drawings are read inside this browser tab and never uploaded. Only your settings and any cable lengths you type are kept in this browser.

1. Load your schedule

.xlsx or .xls. Keep all the boards in one workbook if you can, so feeder rows can be checked against the boards they feed.

A made-up 3-board schedule with some mistakes planted in it.

Only have the single line diagram? Drop the DXF or PDF here, or open SLD to schedule, and the schedule is built from the drawing.

Comparing two revisions? Open the Compare revisions tab, or drop both files here together.

Settings and rule tables (the defaults are fine for most DEWA schedules)

Final circuits: MCB vs minimum cable ?

MCB ACCT mm²ECC mm²

Ring circuits (marked RING in remarks):

Feeders and DB incomers: breaker vs cable ?

Breaker AMulticoreSingle coreECC
Changes re-run the audit straight away.

What it checks

  • 1Phase balance per DB in amps, with the neutral current drawn on a phasor diagram.
  • 2Breaker vs cable and ECC on every final circuit, feeder and DB incomer, plus the number of wires for single and 3-phase circuits.
  • 3Load in the wrong phase column, 3-phase circuits loaded on one phase, SPACE ways that carry load, repeated circuit names.
  • 4RCD / ELCB protection: sockets on 100 mA RCDs, and pools, EV chargers, outdoor equipment and isolator feeders with no ELCB shown. Also circuits loaded past their MCB.
  • 5The arithmetic: R + Y + B against each row's total (CON. KW), totals rows, maximum demand against connected load x diversity, and SMDB feeder rows against the boards they feed.
  • 6A project tree and revision compare: MDB → SMDB → DB built for you, and a board-by-board diff between two schedules.
  • 7A swap list that balances each DB without crossing RCD groups. Download it with the full audit as Excel.
  • 8SLD to schedule: no Excel? Upload the SLD as DXF or a readable PDF and the schedule is rebuilt from the drawing, then checked the same way.

This is a checking aid. It reads what is written in the sheet and does not replace the designer's calculations or the authority's review.

SLD to load schedule

Upload a single line diagram as DXF or PDF. The tool reads the boards, breakers, cables and loads written on it and builds the load schedule, then runs the same audit on it.

A made-up MDB, SMDB and two DBs, one drawn as a table.

Upload a readable PDF

The tool reads the text inside the drawing. A scanned PDF or a photo has no text in it, only a picture, so nothing can be read from it.

  • Best: DXF straight from AutoCAD. Use SAVEAS and pick any AutoCAD DXF version. DWG cannot be read in a browser, so save it as DXF first.
  • PDF: plot it from CAD with "DWG To PDF" (or print to PDF from Revit). Do not scan a printed copy.
  • SHX fonts: AutoCAD turns SHX text into lines in a PDF. Use a TrueType font, or set PDFSHX to 1 before plotting so the text is kept as searchable comments.
  • Reads best: detailed SLDs where each board's outgoing ways show the breaker, cable and load. Riser and authority overview sheets carry less, so expect more ways to check.
  • Quick check: open the PDF and try to select a word with the mouse. If you can, the tool can read it.
  • SLDs made in E-134 carry their load schedule inside the DXF and PDF, so they come back exactly as they were.

Nothing leaves your browser. Always check the result against the drawing before you use it.

Generate a new load schedule (.xlsx)

A ready-to-fill Excel workbook with live formulas: points matrix, phase loads, currents, unbalance, cable checks, demand factors, and every board's totals linked up to the SMDB, MDB, riser, LVP and summary sheets. Charts included.

Typical floors builder (any number of floors: 5, 60 or 200+)

Rebuilding replaces only the typical-floor boards. Podium, basement and anything you added by hand stay.

Boards Add, remove or rename boards. "Fed from" sets where each board's totals are carried to.

Board nameTypeFed fromWays / spare rows ?Incomer APhaseLocation
⧉ copies a board with the next number, handy for typical floors.

Sheets in the download

Feed structure

Opens in Excel. Yellow cells are inputs, grey cells are formulas.

Load schedule audit

Compare two revisions

Tender vs as-built, DEWA-approved vs as-built, or any two issues of the same schedule. Load the older and the newer file and you get a board-by-board and circuit-by-circuit change list, review comments written from the changes and the audit of both files, and an Excel download.

  1. 1Choose the older schedule (e.g. tender or DEWA-approved). Click the box or drop the Excel file on it.
  2. 2Choose the newer schedule (e.g. as-built). The comparison opens straight away below.
  3. 3Read the results: review comments, the board tree marked changed / added / removed, and the circuit-by-circuit list. Download it all as Excel.

Pick both, in any order. The comparison opens as soon as the second one is read.

The newer file is checked with the same rules, so the comments show findings that are new in the revision and the ones that were fixed.

How the checks work

Reading the workbook

Every sheet is scanned for a circuit header (CKT, CIRCUIT). The rows around it tell the tool which columns hold the MCB rating, CCT and ECC sizes, description, ELCB and the R / Y / B load columns. Board name, fed-from and the incomer cable are read from the rows above and below. Several boards stacked on one sheet are handled.

Loads are taken from the per-circuit load columns, never from point counts, so the figures match your own totals.

Phase balance and neutral

  • Phase current I = P / (230 V x PF)
  • Unbalance = (I max - I avg) / I avg
  • Neutral IN = √(IR² + IY² + IB² - IRIY - IYIB - IBIR), same PF on all phases

3-phase circuits written over three rows (20 / AMP / TP) are kept together and never moved.

Corrected schedule

The corrector fixes what the rules can decide: breakers that carry more than their rating, cables and ECCs below the rule tables, loads in the wrong phase column, 3-phase loads on one phase, number of conductors on 3-phase ways, 30 mA on pool and EV feeders, phase balance by swaps inside each RCD group, and every total, feeder row, incomer row and maximum demand up the tree. It then re-checks the whole workbook.

Changed cells are yellow (design) or blue (arithmetic) with the old value in a note, and a Corrections log sheet lists each one. Feeder rows that carry more than their board (tenant allowances) are kept and listed.

Schedule tools

The seven tools under Schedule tools read the same board tree. Typical floors are multiplied out, so a DB drawn once for 6 floors counts 6 times in the BOQ, labels and loads. Voltage drop uses typical mV/A/m values for copper (BS 7671 Appendix 4). Fault level starts at the transformer (size estimated from the incomer, impedance 4 to 6 % per IEC 60076-5, c = 1.05 per IEC 60909) and drops down each cable. Maximum Zs is 0.95 x U0 / (k x In) with k = 5, 10 or 20 for type B, C or D, and the T&C sheet shows the 80 % field value.

Discrimination is a first pass on rating ratios (2 : 1 is safe for most makes, 1.6 : 1 needs the maker's tables). Generator sizing takes the running load plus margin and checks the largest motor start against the first load step. Lengths you type in the cable schedule are kept in your browser for that file. Always check the results against the manufacturer's data before you issue anything.

Single line diagrams

The SLD uses the same board tree as the audit. Each feeder row is matched to the board block it names, including typical floors such as "SMDB-8,9,12 F" or "DB-FLAT 2,3,4", which are drawn once and shown as TYP. on every other floor. Breaker type comes from the column the rating sits in (ISO, MCCB, ACB), fault level from the kA column, RCD groups from the ELCB cells.

Sheets: main LV supply, a distribution schematic per LVP, one SLD per SMDB / MDB / busbar / MCC and one schematic per DB. Audit fails and warnings are numbered on the drawing. Boards that no feeder row names are listed so you can link them by hand.

The balancer

Each DB way keeps its phase. The tool tries swapping the contents of two ways (a circuit with another circuit, or with a SPACE) and keeps the swap that lowers unbalance the most. It repeats until the target is met or no swap helps.

With the RCD option on, swaps only happen inside one ELCB group. Groups come from merged ELCB cells, "ELCB-01" style tags, or rating labels such as "ELCB 40A 4P 30mA". A label on the first way of the board is read as the start of each group, one on the last way as the end. When labels sit mid-group, ways that could belong to either neighbour are marked ? and any socket finding on them drops to Info.

Cable rules and severities

  • Fail: cable two or more sizes under the table, load above the MCB, missing MCB or cable, load in the wrong phase column, SPACE carrying load, 3-phase load on one phase, R + Y + B not equal to the row total (CON. KW), wrong number of wires on a 3-phase circuit, pool or EV equipment with no RCD.
  • Warning: one size under, small ECC, socket on a 100 mA RCD (BS 7671 411.3.3), isolator or outdoor feeder with no ELCB shown, maximum demand not equal to connected load x diversity, unbalance over target, totals or feeder figures that do not match.
  • Info: feeder connected load above its breaker (diversity is not applied), unreadable feeder cable text.

Checking a DEWA load schedule before submission

Most rejections and site changes trace back to a few schedule mistakes: a load typed into the wrong phase column, a 3-phase unit entered on one phase, a total row whose SUM range missed the last circuits, or an SMDB feeder row that was never updated after the DB changed. This page finds those in seconds across every board in the workbook, and gives a short list of circuit swaps to bring each DB within your balance target without moving circuits between RCDs.

Once the schedule is clean, the same file gives you the single line diagrams. Drafting an SLD by hand for a 20-floor tower takes days and drifts out of step with the schedule at every revision. Here the drawings are rebuilt from the schedule each time, so the SLD always shows the breaker, cable and load that the schedule says. Export the full set as a vector PDF for review, or as DXF to finish in AutoCAD with your own title block.

Quick summary in your language

Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

This lab audits your Excel load schedules: phase balance, breaker against cable size, RCDs and totals. It then draws the single line diagram for you (PDF, DXF, SVG) and builds T&C sheets, a BOQ and a cable schedule. You can also upload an SLD (DXF or PDF) and rebuild the load schedule from it. Everything runs in your browser, and you can download a corrected, formula-linked workbook.

Project checks

Distinguish connected load, diversified demand and the capacity approved by the utility. Reconcile totals and equipment labels with the single-line diagram before issuing a revised schedule.

NEXT STEP

Where to go from here

Related labs that pick up where this one ends.

Cable Sizing & Voltage DropSize the feeders the schedule calls for.DES-604LV Switchgear Design LabTurn the schedule into panel design.E-127DEWA Design ToolsCable and breaker selection to DEWA rules.E-102Design Basis & Authority WorkflowLoad, transformer and approvals workflow.E-129
Track what you have opened on My progress.All labs → · Ask the Copilot →
Uploading