Enter the project once. The lab works out the connected load, maximum demand, transformers and substation, fault level, main cables and voltage drop, standby generator and power factor correction, then draws the single line diagram and lists what the authority will ask for. Every figure is live, so change an input and the whole pack updates.
Start with the authority. It sets the supply voltage, standard transformer sizes, voltage drop limit and the approval steps. Then give the building basics. Everything else starts at a typical value you can change later.
Each load group is estimated from floor area and services, then multiplied by its diversity factor. Drag a slider to change a diversity factor and watch the maximum demand move.
Thumb rules are the same calibrated values used in E-129. Replace them with the real load schedules (E-134 Load Schedule Auditor) as the design develops.
Drawn from your inputs: authority MV supply, ring main unit, transformers, main LV boards, the essential board with generator and ATS, and every main feeder. Tap any item for its rating and the reason behind it.
The transformer, ACB, busduct and feeder details appear here, with the rule that sized them.
Orbit the building, see the substation at ground level, the rising mains and how much demand each riser carries. Press Energise to watch the supply come on floor by floor.
Drag to orbit, pinch or scroll to zoom.
Each feeder is sized for its demand current, derated for ambient temperature and grouping, then checked for voltage drop. If the drop is over budget, the next size up is picked automatically. Edit any length or load to see the effect.
The usual path from load application to energisation for the selected authority. Durations are typical and editable. Press Play to walk through the stages.
What a typical load application and design approval needs for the selected authority. Items marked IN PACK are produced by this lab. Tick the rest as you collect them.
Preview the pages below, then save them as a PDF from the print dialog, download the Excel workbook with live formulas, or take the single line diagram as an image.
Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.
This lab builds a load application pack for DEWA, ADDC, SEWA or New Zealand: demand, transformers, fault level, SLD, schedules and checklist. Check the authority's latest forms before you submit.
یہ لیب DEWA، ADDC، SEWA یا نیوزی لینڈ کے لیے لوڈ ایپلیکیشن پیک بناتی ہے: ڈیمانڈ، ٹرانسفارمرز، فالٹ لیول، SLD، شیڈول اور چیک لسٹ۔ جمع کرانے سے پہلے اتھارٹی کے تازہ ترین فارم چیک کریں۔
यह लैब DEWA, ADDC, SEWA या न्यूज़ीलैंड के लिए लोड एप्लिकेशन पैक बनाती है: डिमांड, ट्रांसफॉर्मर, फॉल्ट लेवल, SLD, शेड्यूल और चेकलिस्ट। जमा करने से पहले अथॉरिटी के नवीनतम फॉर्म जाँचें।
يبني هذا المختبر ملف طلب الحمل لديوا أو أبوظبي أو الشارقة أو نيوزيلندا: الطلب الأقصى، والمحولات، ومستوى العطل، والمخطط أحادي الخط، والجداول، وقائمة التحقق. راجع أحدث نماذج الجهة قبل التقديم.
Build a DEWA, ADDC, SEWA or NZ load application pack: maximum demand, transformers, fault level, SLD, cable and VD schedule, checklist and timeline.
A 32-storey residential tower with retail and district cooling: enter the GFA, floors, basements and EV chargers, read the maximum demand and the transformer count, check the rising main voltage drops, then print the pack and tick off the owner documents still needed.
Check that the submission package uses one accepted design basis across the load schedule, drawings and calculations. Assign each outstanding authority comment to a responsible person and trace the response to its evidence.
Related labs that pick up where this one ends, and a learning path to follow.