Codes & standards 6
NFPA 14BS EN 671-1BS 5306-1BS 9990AS 2441AS 2419.1
Regions 3
UAEAustraliaInternational
Views
2D3D4D
Q&A505 Fire Protection questions →Site cases21 Fire Fighting site cases →
FF-205 · FIRE FIGHTING · HOSE REELS AND RISERS

Hose Reel, Landing Valve & Wet Riser Lab

Lay out hose reels and landing valves on a floor plate and see the uncovered areas light up. Then run the wet riser up the building, find the floors that need pressure reducing valves or a new pressure zone, and check the hose reel supply.

NFPA 14UAE Fire & Life Safety CodeBS 9990BS EN 671-1BS 5306-1AS 2441AS 2419.1

How to use: press Auto place, then drag any reel or valve and watch the coverage update. Tap i for plain explanations.

1. Floor and equipment

A rectangular floor plate with an allowance for walls and furniture.

Floor plate
Hose reels
Landing valves and riser

2. Coverage plan

Drag reels or valves. Red cells are out of reach. Tap a point twice to delete it.

3. Checks

    4. Pressure up the riser

    Static pressure (pump at churn) and residual pressure (pump at flow) at every landing valve, with pressure reducing valves and zones marked.

    5. How it works

    Coverage

    A hose reel covers every point within its hose length plus a short jet, measured along the route a person would walk. The route factor shrinks the straight-line reach to allow for walls, doors and furniture. Landing valves cover the travel distance the fire brigade hose can reach, for example 61 m in NFPA 14 for unsprinklered floors or the distance in your authority's code.

    Static and residual pressure

    With no flow, the pump churn pressure falls by 0.0981 bar for every metre of height. That static pressure is the worst case for the lower floors: above 12.1 bar (175 psi) NFPA 14 needs pressure regulating devices on the outlets. With water flowing, friction in the riser also eats pressure, so the top outlets must still have the minimum residual: 6.9 bar for 65 mm Class I outlets, 4.5 bar for 40 mm Class II hose.

    Pressure zones

    When the bottom floors are too high and the top floors too low at the same time, one pump cannot serve the whole height. Split the riser into zones with separate pumps, or with a break tank or pressure reducing station partway up.

    Learning and checking tool. Final layouts must follow the authority's code, the fire strategy and the equipment data sheets.

    Quick summary in your language

    Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

    This lab places hose reels and landing valves on a floor plan, shows uncovered areas and checks wet riser pressure on every floor. Fit pressure reducing valves where the pressure is too high.

    About this lab: Hose Reel, Landing Valve & Wet Riser Lab

    Hose Reel, Landing Valve & Wet Riser Lab

    Place hose reels and landing valves on a floor plate and see uncovered areas, then check wet riser static and residual pressure on every floor, PRVs and pressure zones.

    Topics you can explore

    • Hose reel reach and route factor
    • Landing valve travel distance
    • Static and residual pressure
    • Pressure regulating valves
    • High rise pressure zones
    • Hose reel supply flow

    Practical engineering example

    A 15 floor tower with 3.6 m floors and a pump giving 13 bar at 1,893 L/min (15.5 bar at churn) holds about 7.5 bar at the top landing valve while flowing, but the lowest floors see more than 12.1 bar static, so their landing valves need pressure reducing valves.

    Developed by Eng. Mannan Maqsood. Verify against current project requirements and the applicable authority rules.

    Project checks

    Map the standpipe pressure zones and identify the actual outlet and regulating device. Use the governing design and test basis to assess both static pressure and the required condition under flow.

    NEXT STEP

    Where to go from here

    Related labs that pick up where this one ends.

    Fire Pump & Tank Sizing LabSize the pump that feeds the risers.FF-203 →Smoke Extract & Stair PressurisationKeep the fire fighting stair clear.FF-204 →Sprinkler Hydraulic CalculatorSprinkler demand on the same riser.FF-202 →FAT, SAT & Site Testing LabHydrostatic and flow tests on site.SITE-506 →
    Your work in each lab is saved in this browser.Save or move my progress · All 127 labs · Ask the Copilot