Codes & standards 12
IEEE 80BS 7430EN 50522IEC 61936-1BS EN 50522AS/NZS 3000
+6 more
IEEE 81IEEE 837AS 2067AS/NZS 7000IEC 60364IEC 60364-4
Regions 8
DubaiAbu DhabiSharjahN. EmiratesSaudiAustraliaNew ZealandInternational
Views
2D3D4D
Q&A145 HV bank questions →Site cases33 HV and MV site cases →
HV-508 · HV ACADEMY

HV Substation Earthing Lab

Design a substation earth grid to IEEE 80 and see what it does during an earth fault. Watch the ground surface rise into a potential mountain in 3D, walk a person out through the fence while touch and step voltages update, test the soil with a Wenner survey, size the grid conductor and check the hot zone. Click any for a plain-language explanation.

IEEE 80Touch & stepGPRWenner testBS 7430EN 50522ENA EG-0

1. Fault, soil and grid data

Pick your region first. It loads a typical soil resistivity, earth fault current, clearing time and split factor. Replace them with your soil test and fault study results.

Click the ground or any part
Height and colour show the surface potential during the fault. The grid, rods and transformer are at the full GPR. Click the ground to read the touch voltage at that spot.

Engineer's Notes: substation earthing

The grid is a safety device

An earth grid has two jobs: give fault current a low-impedance path so protection operates, and keep the voltages people can touch or step across below what the body can tolerate for the fault duration. The second job drives most of the design.

Fault current and time come first

The earth fault current, how much of it actually flows into the soil (split factor) and how fast protection clears it decide everything else. Faster clearing raises the tolerable voltages; a realistic split factor can shrink the grid.

Soil is the unknown

Resistivity can vary from under 10 Ω·m in wet saline ground to thousands in dry sand or rock. Always test the site, in more than one direction, and design for the driest season.

Watch the edges

The highest touch voltages are in the corner meshes and just outside a bonded fence. Extra conductors near the perimeter, rods at the corners and a crushed rock layer do most of the work.

Frequently asked questions

What is the difference between touch voltage and step voltage?

Touch voltage is the difference between earthed metalwork a person touches and the ground under their feet. Step voltage is the difference between two points on the ground 1 m apart. Both appear when earth fault current flows into the soil, and both must stay below tolerable limits.

What is ground potential rise (GPR)?

GPR is the voltage the earth grid and everything bonded to it rise to during an earth fault, relative to remote earth. It equals the grid current multiplied by the grid resistance. If GPR is below the tolerable touch voltage, the design is safe without further checks.

Why is crushed rock used in substations?

A layer of high-resistivity crushed rock adds resistance in series with a person's feet, so the body current for a given touch or step voltage is lower. This raises the tolerable voltages, often by a factor of two or more.

How is soil resistivity measured?

The Wenner method uses four equally spaced pins in a line. Current flows between the outer pins and voltage is measured between the inner pins. Apparent resistivity is 2 x pi x a x R, and repeating the test at increasing spacings shows how resistivity changes with depth.

What is a hot site?

A site where the earth potential rise exceeds 430 V, or 650 V for faults cleared within 0.2 s. Telecom and LV services entering the hot zone need isolation or special earthing to avoid transferring dangerous voltages.

Topics: substation earthing · earth grid · IEEE 80 · touch voltage · step voltage · mesh voltage · GPR · EPR · grid resistance · split factor · decrement factor · crushed rock · Wenner test · soil resistivity · earth conductor sizing · hot zone · transferred potential · combined HV/LV earthing

Related labs

Standards and regions covered

Built around DEWA, ADDC (TAQA Distribution) and SEWA 11 kV and 33 kV distribution requirements, IEC 62271, IEC 60076, IEC 60909, IEC 60287, BS EN 50522, IEEE 80, AS 2067 and NZ Electricity (Safety) Regulations 2010. Engineers use it on projects in Dubai, Abu Dhabi, Sharjah and the Northern Emirates, and in Auckland, the rest of New Zealand and Australia. Always confirm the edition your authority or client has adopted before relying on a result.

NEXT STEP

Where to go from here

Related labs that pick up where this one ends.

HV Academy hubAll 17 high voltage labs in one learning path.HV ACADEMYProtection & Coordination StudioGrade HV relays, fuses and LV breakers on a live time-current chart, simulate faults in 4D, test 87T…HV-507 · previousInsulation Coordination & Surge LabSelect surge arresters, check LIWL margins and protective distance, watch lightning surges reflect in 4D and…HV-509 · nextMV Earthing & Step/Touch LabDesign a substation earth grid to IEEE 80: grid resistance, GPR, mesh and step voltage against tolerable…MV-508 · MV view
Track what you have opened on My progress.All labs → · Ask the Copilot →