HVAC-409 · HVAC · ACOUSTICS

Plant Noise Lab

Add up the noise from rooftop plant, AHUs, chillers, cooling towers and generators at a boundary or a neighbour's window. Each source spreads with distance, can be screened by a barrier and is summed band by band, giving dB(A) against day and night limits and the NR rating inside the room.

ISO 9613-2BS 4142BS 8233NZS 6802Auckland Unitary PlanDubai Municipality

How to use: list the plant with its sound power in dB(A), the distance to the receiver, how it sits (directivity) and any barrier. Tap i for help.

1. Inputs

Noise sources

Lw = A-weighted sound power from the maker. Q: 1 free field, 2 on a roof or ground, 4 against one wall, 8 in a corner. Barrier h = height of the barrier top above the straight line from source to receiver, a = source to barrier distance. Night 1 = runs at night.

Receiver and limits

2. Sound at the receiver

Octave band spectrum against the NR curves, a 3D site with sound rings, and the day and night levels.

3. Checks

    4. Each source at the receiver

    Levels in dB(A) with all sources running. Biggest contributor first.

    5. Octave bands at the receiver

    6. How it works

    Sound power and sound pressure

    Makers quote sound power level Lw, the total acoustic power of the machine. What you hear at a point is the sound pressure level Lp, which falls by 6 dB for every doubling of distance from a point source. A machine on a roof radiates into a half space, so it is 3 dB louder at the same distance than in free field (directivity Q = 2), and 6 dB louder against a wall (Q = 4).

    Adding sources

    Decibels add on an energy basis: two equal sources give +3 dB, ten give +10 dB. The loudest source dominates, so treat that one first.

    Barriers

    A solid barrier that breaks the line of sight adds a path difference. The attenuation depends on that path difference compared with the wavelength (Maekawa), so barriers work well at high frequencies and poorly at low frequencies. Generators and large fans have strong low frequency noise, so barriers alone rarely fix them. Single barriers are capped at about 20 dB.

    Limits

    Outdoors, councils and authorities set day and night limits in dB(A), for example the Auckland Unitary Plan, NZS 6802 and BS 4142 assessments, or Dubai Municipality and Trakhees environmental limits. Inside rooms, designers use NR or NC curves: about NR 25 to 30 for bedrooms and NR 35 to 40 for offices.

    Screening tool using ISO 9613-2 style spreading, air absorption and a single barrier. Ground effect, reflections and tonality penalties are not modelled. Use an acoustic consultant for planning submissions.

    Quick summary in your language

    Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

    This lab adds up noise from rooftop plant, chillers and generators at the site boundary, with distance and barriers. Check the night limit, which is usually the hardest one to meet.

    About this lab: Plant Noise Lab

    Plant Noise Lab

    Sum the noise from rooftop plant, AHUs, chillers, cooling towers and generators at a boundary or window with distance, directivity and barriers, band by band, against day and night dB(A) limits and NR inside rooms.

    Topics you can explore

    • Sound power and sound pressure level
    • Directivity factor Q
    • Decibel addition
    • Maekawa barrier attenuation
    • Air absorption
    • NR curves
    • Day and night noise limits

    Practical engineering example

    A rooftop AHU (85 dB(A)) and two air cooled chillers (92 dB(A) each) with a 1.5 m screen, a 98 dB(A) generator against a wall 40 m away and two exhaust fans add up at a residential boundary. The generator and chillers set the day level, while only the AHU and exhaust fans run at night, so the night check against 40 dB(A) is the one to watch.

    Developed by Eng. Mannan Maqsood. Verify against current project requirements and the applicable authority rules.

    Project checks

    Identify the source, transmission path and receiver before selecting a noise treatment. Compare equipment data and measured conditions with the approved acoustic criteria and operating modes.

    NEXT STEP

    Where to go from here

    Related labs that pick up where this one ends.

    Commercial Kitchen Ventilation LabKitchen exhaust fans on the roof.HVAC-410 →Standby GeneratorsGenerator sizing and rooms.E-112 →Plant Room PlannerWhere to put the plant.MEP-801 →Seismic Restraint LabRestrain the plant on its mounts.MEP-803 →
    Your work in each lab is saved in this browser.Save or move my progress · All 127 labs · Ask the Copilot