MEP-801 · CROSS-TRADE · SPACE PLANNING

Plant Room & Riser Space Planner

Give the building type, area and floors, and get first-pass sizes for every MEP plant room and riser at concept stage: substation, LV room, generator, chiller or ETS room, FAHU rooms, water and fire tanks, pump rooms, telecom room and the riser shafts on each floor. Drag the floors slider to see how plant space grows with the building.

DEWA and ADDC substation rulesEmpower ETSUAE Fire & Life Safety CodeTDRA telecomCIBSE and BSRIA rules of thumbNZ and AU practice

How to use: change the building, and every room updates. These are concept stage allowances to reserve space with the architect, not final sizes. Tap i for explanations.

1. Building

Concept stage inputs.

Building
Densities

2. Where the plant goes

Basement, ground, roof and the risers through every floor.

3. Checks

    4. Room and riser schedule

    5. How the allowances are worked out

    Electrical

    Demand comes from the load density times the gross area. The utility transformer size sets how many transformers, and each one needs substation and LV room space. Standby generators are sized for the life safety and essential share of the load.

    Mechanical

    Cooling load comes from the W/m² density. District cooling needs an ETS room, chillers need a plant room or roof space, and fresh air units are sized from the occupancy at about 10 L/s per person. Shafts are sized at about 6 m/s for the main air risers.

    Plumbing and fire

    Domestic water storage is one day of use. Fire water follows the larger of a typical sprinkler and wet riser demand for 60 to 90 minutes. Pump rooms hold the booster and fire pump sets.

    Risers

    Each floor plate needs an electrical riser, an ELV riser, a plumbing wet riser and mechanical shafts. Large plates need more than one set so cable and pipe runs stay short.

    Concept stage rules of thumb only. Confirm with each discipline's calculations and the authority's room standards, for example DEWA substation and Empower ETS room requirements.

    Quick summary in your language

    Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

    This lab gives concept-stage sizes for every MEP plant room and riser from the building type, area and floors. Reserve these spaces early, because they are hard to win back from the architect later.

    About this lab: Plant Room & Riser Space Planner

    Plant Room & Riser Space Planner

    Concept stage sizes for every MEP plant room and riser: substation, LV room, generator, ETS or chiller plant, FAHU rooms, water and fire tanks, pump rooms, telecom room and shafts.

    Topics you can explore

    • Electrical demand and transformers
    • Generator room
    • ETS and chiller plant
    • FAHU rooms and air shafts
    • Water and fire tank rooms
    • Pump rooms
    • Telecom room
    • Riser sets per floor plate

    Practical engineering example

    A 40 floor residential tower with 1,200 m² floor plates, a 6,000 m² podium and district cooling needs about 3 MVA from three 1,500 kVA DEWA transformers, roughly 5 MW of cooling through an ETS, and about 1,000 m² of MEP plant rooms in total, under 2% of gross area thanks to district cooling.

    Developed by Eng. Mannan Maqsood. Verify against current project requirements and the applicable authority rules.

    Project checks

    Draw maintenance and replacement space as well as equipment footprints. Check riser entries, access panels, removable components and the routes needed to install and service the selected equipment.

    NEXT STEP

    Where to go from here

    Related labs that pick up where this one ends.

    Authority Submission Pack BuilderTurn the loads into a DEWA pack.E-135 →Clash Detection LabCheck the ceiling void and clashes.E-121 →Chilled Water Pipe Sizing LabSize the CHW risers you reserved.HVAC-404 →Water Storage Tank Sizing LabDetail the tank rooms.PLB-702 →
    Your work in each lab is saved in this browser.Save or move my progress · All 127 labs · Ask the Copilot