HVAC-410 · HVAC · KITCHENS

Commercial Kitchen Ventilation Lab

Size the exhaust for a commercial kitchen hood from its type, length and cooking duty, then the grease duct, make-up air and the cooling load of that make-up air in Gulf summer. Checks the wet chemical suppression interfaces and the grease duct rules, and shows what demand control ventilation saves over a service day.

NFPA 96IMC 507ASHRAE 154UL 300 / NFPA 17AUAE Fire & Life Safety CodeAS 1668.1 & .2

How to use: pick the hood type and the heaviest cooking under it, enter the hood length and the outdoor design. Tap i for help.

1. Inputs

Hood and cooking
Grease duct and fan
Make-up air and climate

2. Kitchen ventilation

Section through hood and duct, a 3D kitchen and the exhaust over a service day with and without demand control.

3. Checks

    Suppression and fire interfaces

      4. Airflows and sizes

      5. How it works

      Exhaust rate

      Type I grease hoods are sized per metre of hood length from the hood style and the heaviest cooking under it (IMC 507 and ASHRAE 154). An island canopy needs more air than a wall canopy because there is no wall to guide the plume. Heavy duty appliances such as char broilers and woks need much more than ovens.

      Grease duct

      NFPA 96 sets a minimum of 2.54 m/s (500 fpm) to keep grease moving, and designers often use 7 to 9 m/s. The duct is liquid tight and welded (1.37 mm carbon steel or 1.09 mm stainless), slopes back to the hood or a grease reservoir, has cleanout doors at every change of direction and runs in a fire rated shaft to the roof. Discharge at least about 1 m above the roof and well away from fresh air intakes.

      Make-up air

      About 80 to 90% of the exhaust is supplied as make-up air near the hood, and the rest transfers from the dining area so the kitchen stays slightly negative. In Dubai summer that outdoor air carries a large latent load, so make-up air units with chilled water or DX coils are often bigger than the space cooling.

      Suppression

      A UL 300 wet chemical system protects the hood, plenum, duct entry and appliances. When it discharges it shuts the gas valve and the power to cooking appliances under the hood, stops the make-up air and signals the fire alarm. Exhaust fans normally keep running to clear smoke unless the system listing says otherwise.

      Concept sizing tool. Final airflows come from the listed hood maker, and the suppression design from the listed system installer and the local Civil Defence or fire engineer.

      Quick summary in your language

      Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

      This lab sizes kitchen hood exhaust, grease duct, fan and make-up air, with fire suppression interfaces. Keep grease ducts sealed and accessible for cleaning, as they are a major fire risk.

      About this lab: Commercial Kitchen Ventilation Lab

      Commercial Kitchen Ventilation Lab

      Size kitchen hood exhaust from hood type, length and cooking duty, then the grease duct velocity, fan, make-up air and its Gulf cooling load, with NFPA 96 duct rules, UL 300 suppression interfaces and demand control savings.

      Topics you can explore

      • Hood exhaust rates per metre
      • Hood styles and cooking duty
      • Grease duct velocity and construction
      • Make-up air and transfer air
      • Make-up air cooling load
      • Wet chemical suppression interfaces
      • Demand control ventilation

      Practical engineering example

      A 4 m wall canopy over medium duty fryers and griddles needs about 1,860 L/s. A 600 mm round grease duct carries it at about 6.6 m/s. With 85% make-up air tempered to 24°C at Dubai summer design (46/29°C), the make-up air unit needs about 80 kW (23 TR) of cooling, nearly half of it latent, and demand control ventilation cuts fan and cooling energy by about 36%.

      Developed by Eng. Mannan Maqsood. Verify against current project requirements and the applicable authority rules.

      Project checks

      Review hood capture, replacement air, duct cleaning access and suppression interfaces together. Test the approved arrangement with representative appliance use and the actual room pressure conditions.

      NEXT STEP

      Where to go from here

      Related labs that pick up where this one ends.

      LPG & Natural Gas Piping LabGas supply to the cooking line.PLB-705 →Fire Alarm LabInterface the suppression system.FA-201 →Plant Noise LabKitchen exhaust fans and neighbours.HVAC-409 →Fire Stopping SelectorGrease duct through fire walls.MEP-804 →
      Your work in each lab is saved in this browser.Save or move my progress · All 127 labs · Ask the Copilot