MEP-806 · CROSS-TRADE · VERTICAL TRANSPORT

Lifts & Vertical Transport Lab

Run an up-peak traffic analysis for a lift group: round trip time, interval, five minute handling capacity and average waiting time against targets for offices, apartments, hotels and hospitals. Then the electrical side: motor size, supply current, group diversity and what goes on the standby generator with firefighting and evacuation lifts.

CIBSE Guide DBS EN 81-20/50BS EN 81-72BS EN 81-76ISO 8100-32UAE Fire & Life Safety CodeNZBC D2

How to use: enter the floors, population and the lift group. Defaults load for the building type. Tap i for help.

1. Inputs

Building and population
Lift group
Electrical

2. Lift group

Lobby plan with the shafts, a 3D group with moving cars and the cars over time in up-peak.

3. Checks

    4. Traffic analysis (CIBSE Guide D up-peak)

    5. Electrical loads

    6. How it works

    Up-peak analysis

    The morning up-peak is the classic design case for offices: everyone arrives at the main lobby and goes up. CIBSE Guide D works out how many stops a car makes (S) and how high it goes (H) for an average load of 80% of the car capacity, then the round trip time from travel, stopping, door and passenger transfer times.

    Interval and handling capacity

    Interval is the round trip time divided by the number of lifts: the average time between car departures from the lobby. Handling capacity is how many people the group moves in five minutes, as a share of the population. Offices aim for about 25 to 30 s interval and 12 to 15% handling capacity, apartments 45 to 90 s and 5 to 8%.

    Electrical design

    A traction lift motor lifts the car load minus the counterweight balance. Variable voltage variable frequency drives keep the starting current low and can feed energy back on regenerative drives. Groups never all start at once, so a diversity factor applies to the feeder. On mains failure, lifts return one at a time on the standby generator, while firefighting (BS EN 81-72) and evacuation lifts (BS EN 81-76) stay powered from secure supplies.

    Concept traffic study to CIBSE Guide D up-peak formulas. Use a lift consultant or the maker's simulation (lunch peak, two way traffic, destination control) for the final selection.

    Quick summary in your language

    Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

    This lab runs a lift traffic analysis and then sizes lift motors, feeders and standby generator loads. Check waiting time at the morning peak, which is when users notice slow lifts.

    About this lab: Lifts & Vertical Transport Lab

    Lifts & Vertical Transport Lab

    Run a CIBSE Guide D up-peak lift traffic analysis (round trip time, interval, five minute handling capacity, waiting time) and size lift motors, feeders, group diversity and standby generator loads with firefighting and evacuation lifts.

    Topics you can explore

    • Up-peak traffic
    • Probable stops and highest reversal floor
    • Round trip time
    • Interval and handling capacity
    • Average waiting time
    • Lift motor power and VVVF drives
    • Firefighting and evacuation lifts

    Practical engineering example

    A 20 floor office with 90 people per floor at 85% occupancy (1,530 people) and six 17 person lifts at 3.5 m/s gives a round trip time of about 171 s and only 9.3% handling capacity. Eight lifts bring the interval to about 21 s and the handling capacity to about 12.4%, meeting common office targets. Each lift needs about 30 kW and the group feeder about 155 kVA after diversity.

    Developed by Eng. Mannan Maqsood. Verify against current project requirements and the applicable authority rules.

    Project checks

    Set the expected passenger demand, lift layout and operating assumptions before comparing traffic results. Check the adopted design guidance and confirm any independent accessibility or fire-service requirements.

    NEXT STEP

    Where to go from here

    Related labs that pick up where this one ends.

    MEP Manpower & Programme PlannerPlan the installation next.MEP-807 →Standby GeneratorsSize the generator for the lifts.E-112 →Plant Room PlannerCore and riser space.MEP-801 →Seismic Restraint LabLifts and services in quakes.MEP-803 →
    Your work in each lab is saved in this browser.Save or move my progress · All 127 labs · Ask the Copilot