Codes & standards 2
BS 8558AS/NZS 3500.1
Regions 4
DubaiAbu DhabiAustraliaNew Zealand
Views
2D3D4D
Q&A506 Plumbing questions →Site cases46 Plumbing site cases →
PLB-702 · PLUMBING · WATER STORAGE

Water Storage Tank Sizing Lab

Work out daily water use from the occupants, choose how many days to store and how to split it between ground and roof tanks, then size each tank and its compartments. Check the mains connection can refill it, how long water sits in the tank, and watch the levels rise and fall through a day.

Dubai Building CodeDEWAADDC / TAQABS 8558AS/NZS 3500.1WHO water safety

How to use: pick the building type and occupancy. Daily use figures are typical design values you can change. Tap i for explanations.

1. Occupancy and storage

Domestic water only. Fire water is sized in FF-203.

Daily demand
Storage
Mains connection

2. Tanks

Ground (break) tank, transfer pumps and roof tank with compartments.

3. Checks

    4. Tank schedule

    5. How it works

    Daily demand

    Daily use is occupants × litres per person per day, plus irrigation, cooling tower make-up or other process water. Gulf design figures are high because of climate and lifestyle: 200 to 300 L per person per day for apartments is common.

    Days of storage and the split

    Many Gulf authorities and specifications ask for about one day of storage to ride through supply interruptions. Part is held in a ground or basement break tank and part in a roof tank that feeds the upper floors by gravity or the booster sets.

    Water quality

    Water that sits too long loses its chlorine residual and warms up, which encourages bacteria such as Legionella. Aim to turn the tank over in no more than about 24 to 48 hours, keep the tank shaded and insulated, and use two compartments so one can be cleaned while the other stays in service.

    Refill

    The mains connection must refill the daily demand within the hours the supply is available. The lab sizes the connection pipe for that flow at your velocity limit.

    Learning and checking tool. Storage days, compartments and tank materials must follow your authority, for example DEWA or ADDC connection rules and the Dubai Building Code.

    Quick summary in your language

    Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

    This lab sizes domestic water storage from occupancy and daily use, splits it between ground and roof tanks and checks water age. Tanks that are too big let water go stale, so do not oversize.

    About this lab: Water Storage Tank Sizing Lab

    Water Storage Tank Sizing Lab

    Size domestic water storage from occupancy and daily use, split between ground and roof tanks with compartments, size the mains connection and check water age and roof load.

    Topics you can explore

    • Daily demand by building type
    • Days of storage
    • Ground and roof tank split
    • Compartments
    • Mains connection sizing
    • Water age
    • Roof tank structural load

    Practical engineering example

    A 600 resident apartment building at 250 L per person plus 10 m³ of irrigation uses 160 m³ a day. One day of storage with 35% on the roof gives a 104 m³ ground tank and a 56 m³ roof tank, each in two compartments, refilled through a DN50 connection over 16 hours.

    Developed by Eng. Mannan Maqsood. Verify against current project requirements and the applicable authority rules.

    Project checks

    Identify what the tank serves, the accepted storage basis and the usable volume between operating levels. Verify replenishment, access, overflow and separation requirements for the intended service.

    NEXT STEP

    Where to go from here

    Related labs that pick up where this one ends.

    Water Demand & Booster Pump LabPump the stored water up the building.PLB-701 →Fire Pump & Tank Sizing LabSize the separate fire water tank.FF-203 →Fixture Units & Drainage Slope LabBeginner plumbing basics.DES-605 →Clash Detection LabCoordinate tank rooms and risers.E-121 →
    Your work in each lab is saved in this browser.Save or move my progress · All 127 labs · Ask the Copilot