PLB-703 · PLUMBING · DRAINAGE

Drainage Stack & Building Drain Lab

Add up the discharge units of the fixtures, apply the frequency factor and size the soil stack to BS EN 12056-2, with or without a secondary vent. Then size the building drain by slope and fill with Colebrook-White, check self cleansing velocity, and watch a flush travel down the stack.

BS EN 12056-2BS EN 752Dubai Building CodeIPC chapter 7AS/NZS 3500.2NZBC G13

How to use: enter fixtures per floor and floors per stack. Discharge units are the BS EN 12056-2 System I values and you can edit the counts. Tap i for explanations.

1. Stack and fixtures

One stack serving the same fixtures on every floor.

Building
Fixtures per floor
Building drain

2. Stack and drain

Stack loading against capacity, the drain cross section at design flow, and a flush in 4D.

3. Checks

    4. Drain sizes at your gradient

    5. How it works

    Discharge units and K

    Each fixture has a discharge unit (DU) in L/s. They are not simply added: the wastewater flow is Qww = K × √ΣDU, where K reflects how often fixtures are used. The flow can never be less than the largest single fixture.

    Stack capacity

    A stack carries water as a film on the wall with an air core in the middle. Too much water closes the core and pulls the water seals out of the traps. BS EN 12056-2 tables give the capacity of each stack size for primary or secondary ventilation and for square or swept junctions.

    Building drain

    Horizontal drains are sized with Colebrook-White for the gradient, running no more than half full (h/d 0.5) so air can move, and at least 0.7 m/s so solids are carried along.

    Learning and checking tool. Some authorities use IPC or AS/NZS 3500.2 fixture units instead of discharge units. Use the method your authority adopts.

    Quick summary in your language

    Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

    This lab sizes soil stacks and the building drain with BS EN 12056-2 and shows a flush moving through the pipes. Venting matters as much as pipe size, or traps will be sucked dry.

    About this lab: Drainage Stack & Building Drain Lab

    Drainage Stack & Building Drain Lab

    Size soil stacks with BS EN 12056-2 discharge units, frequency factor and stack capacity tables, then size the building drain by gradient and fill with Colebrook-White.

    Topics you can explore

    • Discharge units
    • Frequency factor K
    • Stack capacity tables
    • Primary and secondary ventilation
    • Swept and square junctions
    • Building drain gradient
    • Proportional depth and velocity

    Practical engineering example

    A 25 floor apartment stack with two WCs, two basins, two showers, a kitchen sink, dishwasher, washing machine and floor gully per floor adds up to 265 DU, or about 8.1 L/s at K 0.5. That needs a DN150 primary ventilated stack, or a DN125 with a secondary vent and swept junctions.

    Developed by Eng. Mannan Maqsood. Verify against current project requirements and the applicable authority rules.

    Project checks

    Trace each drainage branch into the stack and building drain. Verify the applicable load, venting, gradient and access assumptions, including the effects of later fixture or routing changes.

    NEXT STEP

    Where to go from here

    Related labs that pick up where this one ends.

    Fixture Units & Drainage Slope LabBeginner drainage basics.DES-605 →Water Demand & Booster Pump LabCold water side of the same fixtures.PLB-701 →FAT, SAT & Site Testing LabAir and water tests on drainage.SITE-506 →Clash Detection LabFalls on drains against other services.E-121 →
    Your work in each lab is saved in this browser.Save or move my progress · All 127 labs · Ask the Copilot