How material submittals and inspection requests work
Two loops run on every MEP project. The submittal loop approves what you will buy. The inspection loop approves what you have built. The second one depends on the first.
Material submittal loop
Inspection request loop
Material submittal log
Add a submittal, record the consultant's return, and resubmit anything coded C or D. Overdue reviews are flagged against the .
New submittal
Inspection request log
Every IR links to the material it uses and the stage it covers. The tracker blocks IRs for unapproved materials and checks the .
New inspection request
A day on site: what would you do?
Ten situations every MEP site engineer meets. Pick your answer and see why.
Dashboard and 4D replay
Drag the date slider (or press play) to replay the project's paper trail. Everything below is recalculated as of that date from your logs.
Submittals by status
Inspection requests by result
Submittals waiting for review (age in days)
S-curve: submitted vs approved (A or B)
By discipline
3D inspection status by floor and zone
Each block is a floor zone, coloured by the inspection requests logged for it. Tap a block to list its IRs. Use the 4D replay in the dashboard tab to move the date; this view follows it.
Zone details
Cover sheets and forms
Generic templates filled from your logs. Projects have their own forms: use these to learn what goes on them, or as a clean starting point.
Material submittal cover sheet
Includes the compliance statement table, attachment checklist and the consultant's review box.
Inspection request form
Includes the contractor's check, attachments, and the inspector's result with signatures.
What a good submittal package contains
Engineer's notes
Habits of document controllers and site engineers who never lose an argument about a submittal.