TRACK Learning path · 6 labs

Site Engineering Track

Installation, testing and paperwork: the side of MEP engineering you learn on site, not in the design office. Six interactive labs in three phases take you from your first permit to handover. Work through them in order, or jump to the one you need today.

Phase 1

Site readiness & safety

Phase 2

The paper trail

Phase 3

Testing, commissioning & handover

Next: Design Engineering Track

Calculations, sizing and drawing compliance: codes and authority rules, symbols, SLDs and P&IDs, cooling loads and duct static pressure, cable sizing and lighting, fixture units and drainage, coordination and calculation sheets.

Open the Design Engineering Track →
BUILT FROM YOUR FEEDBACK

Thank you to the engineers who asked for this

A visitor wrote in asking for a learning path on the site side of the job: installation, testing and the paperwork that goes with it. This track is the answer to that message. Thank you for taking the time to write. Your comments shape what gets built next.

Finish all six labs and print your certificate →   Suggest the next lab →

Project checks

Follow a site activity from approved information through inspection, testing and handover. At each stage, identify who can release the work and which records must be available before concealment or energisation.