Site Engineering Track

Installation, testing and paperwork: the side of MEP engineering you learn on site, not in the design office. Six interactive labs in three phases take you from your first permit to handover. Work through them in order, or jump to the one you need today.

Phase 1

Site readiness & safety

Phase 2

The paper trail

Phase 3

Testing, commissioning & handover

Next: Design Engineering Track

Calculations, sizing and drawing compliance: codes and authority rules, symbols, SLDs and P&IDs, cooling loads and duct static pressure, cable sizing and lighting, fixture units and drainage, coordination and calculation sheets.

Open the Design Engineering Track →
BUILT FROM YOUR FEEDBACK

Thank you to the engineers who asked for this

A visitor wrote in asking for a learning path on the site side of the job: installation, testing and the paperwork that goes with it. This track is the answer to that message. Thank you for taking the time to write. Your comments shape what gets built next.

Finish all six labs and print your certificate →   Suggest the next lab →

Standards and regions covered

Built around DEWA and ADDC (TAQA Distribution) inspection and energisation, DCD inspections and approvals, BS 7671 Part 6, AS/NZS 3000 Section 8 and AS/NZS 3017. Engineers use it on projects in Dubai, Abu Dhabi, Sharjah and the Northern Emirates, and in Auckland, the rest of New Zealand and Australia. Always confirm the edition your authority or client has adopted before relying on a result.