TRACK Learning path · 6 labs

Design Engineering Track

Calculations, sizing and drawing compliance: the design office side of MEP engineering. Six interactive labs in three phases take you from the codes and the symbols to sized systems and a calculation package a consultant can approve. Work through them in order, or jump to the one you need today.

Phase 1

Fundamentals & codes

Phase 2

Discipline sizing

Phase 3

Integration & reporting

Also on MEPVirtual: Site Engineering Track

Installation, testing and paperwork: permits, FC and shop drawings, submittals and IRs, snag lists, method statements and ITPs, FAT, SAT and site testing.

Open the Site Engineering Track →
BUILT FROM YOUR FEEDBACK

Thank you to the engineers who asked for this

A visitor asked for help with the design side: calculations, sizing and getting drawings to comply. These six labs were built in reply. Thank you for taking the time to write. Your comments shape what gets built next.

Finish all six labs and print your certificate →   Suggest the next lab →

Standards and regions covered

Built around DEWA, ADDC (TAQA Distribution), SEWA, UAE Fire and Life Safety Code (DCD), BS 7671, BS EN standards, AS/NZS 3000 and AS/NZS 3500. Engineers use it on projects in Dubai, Abu Dhabi, Sharjah and the Northern Emirates, and in Auckland, the rest of New Zealand and Australia. Always confirm the edition your authority or client has adopted before relying on a result.