Coordination rules
When services compete for space, the least flexible goes first. Click each priority to see why, then review typical clearances.
Typical clearances and allowances
Typical values for learning. Use your project's coordination rules, the BIM execution plan and the manufacturers' requirements.
Ceiling void planner
Set the slab, beam and ceiling levels, then list the services in the void in installation order from the top. The planner stacks them with their insulation, hangers and gaps and checks both the clear corridor and the crossing under the beam. Sizes from DES-603 and DES-605 are loaded when available.
Levels (mm above finished floor)
Result
Services (top to bottom)
Section at the corridor
Section under the beam
3D corridor and 4D installation sequence
Your stack in a corridor crossing a beam. Anything that does not fit is shown red. Play the 4D sequence to see the install order the planner assumes.
Calculation sheet compiler
Fill in the document header and design basis. The compiler pulls the latest results from the HVAC, electrical and plumbing labs in this browser and builds one printable calculation package.
Document header
Include
Reviewer's checklist
Check your package the way the consultant will before you submit it.
Engineer's notes
Lessons from real design reviews.