E-137 · ELECTRICAL · EV CHARGING

EV Charging in Car Parks Lab

Plan the chargers for a car park: how many, which mix of AC and DC, and what they do to the transformer. Compare no load management, a static cap and dynamic load management that fills the spare capacity left by the building, then check the feeder and the authority rules for DEWA, New Zealand and Australia.

IEC 61851IEC 60364-7-722BS 7671 Section 722AS/NZS 3000DEWA EV Green ChargerNCC 2022 J9D4

How to use: enter the bays, the share with chargers and the charger mix. Pick the building type so the arrival pattern and building load match. Tap i on any input for help.

1. Inputs

Car park and region
Charger mix
Supply and load management

2. Car park and charging day

Chargers on the car park plan, a 3D deck and the 24 hour load against the transformer.

3. Checks

    4. Charger schedule

    Indicative cable sizes for short runs on cable tray. Size every circuit for its own route.

    5. Load management compared

    Same car park and the same day, three strategies.

    6. How it works

    Charger mix

    Most cars in residential and office car parks stay for hours, so 7.4 kW single phase or 11 to 22 kW three phase AC chargers are enough. DC chargers suit short stays (malls, fuel stations, fleet depots). A few DC chargers can need more capacity than a whole floor of AC chargers.

    Load management

    Without management every charger can draw full power at the same time, and the car park is sized for that. A static cap limits the EV board to a fixed kW and shares it between cars. Dynamic load management reads the building main meter and gives the EV chargers whatever is left under the transformer limit, so far more chargers fit on the same supply. Cars still get their energy because they stay for hours.

    Rules to check

    Each EV circuit is a dedicated final circuit with its own RCD (Type A with 6 mA DC fault detection in the charger, or Type B) under IEC 60364-7-722, BS 7671 Section 722 and AS/NZS 3000. In Dubai, chargers connect under the DEWA EV Green Charger rules and the Dubai green building regulations ask for EV charging and EV-ready provision in new car parks. In Australia NCC 2022 J9D4 asks for EV-ready distribution capacity in new buildings. New Zealand has no mandatory share yet, so the client brief or the consent conditions set it.

    Learning and checking tool. Confirm charger data, cable sizes and the current authority percentages before design sign-off.

    Quick summary in your language

    Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

    This lab sizes EV chargers for a car park and shows how load management protects the transformer over 24 hours. Use load management instead of oversizing the supply.

    About this lab: EV Charging in Car Parks Lab

    EV Charging in Car Parks Lab

    Size EV chargers for a car park: AC and DC mix, no management versus static cap versus dynamic load management, transformer loading over 24 hours, feeder current and DEWA, NZ and Australian rules.

    Topics you can explore

    • AC and DC charger selection
    • Charging energy per session
    • Static and dynamic load management
    • Transformer loading over 24 hours
    • EV-ready provision
    • RCD types for EV circuits
    • DEWA, NZ and Australian rules

    Practical engineering example

    A 300 bay residential car park with 20% chargers (42 x 7.4 kW and 18 x 22 kW) has 707 kW connected. On a 1500 kVA transformer with a 1200 kVA building demand, unmanaged charging pushes the evening peak to about 99%, while dynamic load management with a 250 kW EV board holds it at the 95% limit, needs only a 380 A feeder and still delivers all 1,080 kWh of charging overnight.

    Developed by Eng. Mannan Maqsood. Verify against current project requirements and the applicable authority rules.

    Project checks

    Check charger load, diversity controls, protection and the approved utility connection as a system. Coordinate equipment location and installation with the car park’s electrical and fire strategy.

    NEXT STEP

    Where to go from here

    Related labs that pick up where this one ends.

    LV Arc Flash & Fault Level LabCheck the EV board for arc flash.E-138 →Renewables, BESS & EV at MVEV hubs at medium voltage.MV-513 →Load Schedule AuditorPut the EV load in the load schedule.E-134 →Energy Audit & Payback LabMeter and cost the charging energy.E-140 →
    Your work in each lab is saved in this browser.Save or move my progress · All 127 labs · Ask the Copilot