ELV-309

TV & Media Systems Lab

Design TV distribution from the dish to the screen. Pick a building, then work through the spectrum, the satellite link, the coax riser, IPTV, fibre and signage. Every number updates live and feeds the next tab.

Start here: choose the building

Each building type loads realistic defaults into every tab: floors, outlets, services, IPTV size, fibre and signage. You can change any value afterwards.

Recommended architecture

    Which system suits which building

    More dots means a more common fit. Most real projects are hybrids, for example satellite over coax to apartments plus IPTV in the amenity areas.

    How a TV system works, in four steps

    1. Receive. Dishes and antennas pick up TV from satellites and transmitters, or an IPTV operator delivers it over fibre.
    2. Process. The headend amplifies, filters, converts and sometimes re-modulates the channels so they can travel through the building.
    3. Distribute. Coax cable with taps and splitters, a multiswitch star, an IP network or fibre carries the signal to each floor.
    4. Deliver. Each outlet must get a level inside a window: too low and the picture breaks up, too high and the TV tuner overloads.

    Equipment library

    Every device used in TV and media systems: what it is, the types and where each is used, typical data, how far you can cascade it, and the mistakes seen on site.

    System maps

    How the equipment connects in real systems. Tap any block to open its library card.

    Spectrum explorer: 1 MHz to 30 GHz

    Drag the slider or tap a band. Coax inside the building carries 5 to about 2400 MHz. Satellite signals arrive at C, Ku or Ka band and the LNB shifts them down to the coax range.

    At this frequency

    Tap a band for details

    Bands are grouped in four lanes: inside the building on coax, broadcast TV and radio, mobile and wireless, and satellite downlinks.

    Wavelength and cable loss

    Higher frequency means a shorter wave and more loss per metre of coax. The trace fades the way the signal does over 50 m of the cable you pick in the riser tab.

    Channel and frequency converter

    Uses the region you picked at the top. Type a channel number or a frequency.

    Dish and satellite planner

    Where to point the dish from your city, which satellites you can see and what they carry. Then size the dish in the next tab.

    Satellites and what they carry

    Highlighted rows are commonly used in the region you picked at the top. Line-up sizes are indicative.

    Dish types

    Several satellites on one system: use a multi-feed bracket or monoblock LNB for satellites a few degrees apart (DiSEqC 1.0 selects up to 4 positions), a toroidal dish for many satellites, or separate dishes. Each satellite needs its own 4 multiswitch inputs (9, 13 or 17-input multiswitches), or a dCSS switch with several satellite inputs. Motorised dishes (DiSEqC 1.2, USALS) are for single homes only.

    Satellite: LNB and multiswitch logic

    The LNB mixes the sky frequency with a local oscillator (LO) so it fits on coax. The receiver picks polarisation with 13 or 18 V and the band with a 22 kHz tone, and the multiswitch routes the right LNB output.

    Dish size and link budget

    Clear-sky estimate. Get the EIRP for your location from the satellite operator footprint map. The result feeds the satellite C/N used in the riser and analyser tabs.

    Network designer

    Build the real network device by device: headend, amplifiers, splitters, taps, multiswitches, dCSS switches, optical links and outlets, each with a model, a cable type and a length. Tap any device to edit it and see the level, C/N and a step-by-step calculation at that exact point.

    1. Start from a template

    Services, headend levels, windows and margin come from the Quick riser calculator tab (open "Levels, tilt and windows" there). Building a new network replaces the current one. Every edit below, including changing a device type, recalculates the whole network instantly.

    2. Riser diagram: design on the drawing

    Click the roof to set dishes, bands and LNB types. Click any device to change its type, model and settings. Click any cable to set its type and length or insert a device into it. Click an outlet group to set drop lengths. Everything recalculates as you go.

    HeadendAmplifierTapSplitterMultiswitch / dCSSOutlet (border shows status)

    The riser diagram is drawn like a shop drawing: red figures are the level arriving at each device, outlet groups show the worst level and the longest drop (for example 68.5 dB @ 50 m), and floors are labelled on the right. Thick lines are multi-line trunks (×13 means 13 cables). The cyan path and moving pulses show the signal route to the selected device. Hover a device for its levels.

    3. Selected device: edit it and probe this point

    Outlet schedule (worst first)

    4. Specification check (consultant review)

    Enter the project specification once. Every change in the design is checked again straight away, the way a reviewer would check a submittal.

    Amplifier schedule: locations and gain settings

    5. Power budget

    Active devices need 12 V adaptors and sockets, and the LNBs are powered through the downlead from the first active device. Long runs and copper-clad steel cable drop the LNB voltage.

    Active device list

    6. Commissioning sheet

    Type the levels measured on site at each outlet. Each reading is checked against the specification window and against the design level (±3 dB).

    7. Project file, report and my equipment library

    My equipment library

    Add real models from manufacturer datasheets. They appear in each device's Model list and in the specification check. Cable loss is fitted from your two datasheet points.

    Quick riser calculator

    A fast what-if for a uniform riser. For a real design with your own devices and lengths, use the Network designer. This calculator walks down the riser, picks the tap value at each node so every outlet lands in its window at the lowest and highest frequency, and adds a line amplifier when the level runs out.

    Building and network

    Services on the coax

    Levels, tilt and windows (TYPICAL, edit to suit)
    Levels are in dBµV. The window is the range a TV tuner is happy with. Tilt means the headend sends the top of the band a few dB hotter, because coax loses more at high frequency.

    Riser schematic with live signal flow

    In windowMarginal C/NLow, high or failingLine amplifier

    Level diagram

    Level along the riser at the bottom (solid) and top (dashed) of each service. The saw-tooth shows cable and tap losses, and each jump is an amplifier.

    Outlet schedule

    Change any tap value to see the effect downstream. Values marked * are your overrides.

    Virtual spectrum analyser and field meter

    Plug the virtual meter into any outlet from the riser design. Move over the trace to read a carrier. Switch faults on to see what they do to the spectrum and the picture.

    Move over the trace to read frequency and level.

    Inject a fault

    What the viewer sees

    Meter readings at this outlet

    Picture problems lab

    What viewers see when something is wrong, what the meter shows, why it happens and how to fix it. Pick a problem, or drag the level and MER yourself to find the digital cliff.

    3D building and 4D signal flow

    Drag to orbit, scroll or use the buttons to zoom, tap a node to inspect it. Colours come straight from the riser design.

    Tap a coloured node marker.

    IPTV and multicast sizing

    Live TV on IP is multicast: one copy of a channel per link, no matter how many TVs watch it, as long as the switches run IGMP snooping. Video on demand and catch-up are unicast and scale with viewers.

    Multicast in action

    Tap a TV to change its channel. Turn IGMP snooping off to see flooding.

    24-hour load (4D)

    Viewing profile for this building type. Drag the hour or press play.

    RF over fibre and optical budget

    Fibre carries the whole RF spectrum as light to far buildings, villas in a compound or terminal zones. The receiver turns light back into RF coax signal.

    Prx = Ptx - fibre km × dB/km - splitter losses - connectors - splices - margin RF out ≈ RF ref + 2 × (Prx - P ref) (1 dB less light gives 2 dB less RF, without AGC)

    Wavelengths on one fibre (GPON with RF overlay)

    Screens, signage, FIDS and PIDS

    Size the screen for the viewing distance, the text for legibility and the brightness for the light around it. Covers guest rooms, lobbies, mall windows, airport FIDS, station PIDS and outdoor bus shelters.

    Bill of materials and design report

    Built from the current riser, satellite, IPTV, fibre and signage results. Quantities are design estimates, with 10 % added on cable lengths. No prices.

    Worked example from your design

    This follows the worst outlet in your current riser design at the top of each service band, using the same numbers as the engine.

    Formula register

    Engineer's notes

    Testing and commissioning checklist

    Quiz

    Quick summary in your language

    Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

    This lab designs TV systems: satellite, multiswitches, coax risers, IPTV and RF over fibre, with signal level budgets. Measure the signal at the last outlet, as that is where problems show first.

    TV and media distribution: an engineer's guide

    From dish to outlet

    A building TV system receives satellite, terrestrial or operator IPTV signals, processes them at a headend and distributes them on coax, IP or fibre. Coax designs work by level: each outlet must sit in a window, checked at both ends of every band because cable loss rises with frequency.

    Satellite IF and the 2450 MHz question

    Satellite signals at Ku band (10.7 to 12.75 GHz) are converted by the LNB to 950 to 2150 MHz, or 290 to 2340 MHz for wideband LNBs. Coax parts rated 5 to 2400 or 2450 MHz carry that with margin. 2450 MHz itself is the ISM band used by Wi-Fi and microwave ovens, so good screening matters.

    IPTV and signage

    The Network designer builds real risers device by device (multi-line 5, 9, 13 or 17-line multiswitch trunks, amplifiers, taps, dCSS, fibre), recalculates every outlet instantly and checks the design against the project specification, power budget and commissioning results.

    IPTV relies on multicast with IGMP snooping and a querier. Hotels add PMS integration, hospitals add patient TV and airports and stations add FIDS and PIDS screens, sized by viewing distance, legibility and brightness.

    Related labs

    ELV-303 CCTV and security · ELV-307 Access control · E-130 Harmonics · SITE-506 FAT, SAT and testing

    Project checks

    Trace the distribution route from the signal source to each outlet. Compare losses, active equipment and service access with the approved telecom or media design rather than relying on a simple outlet count.

    NEXT STEP

    Where to go from here

    Related labs that pick up where this one ends.

    CCTV, Access Control & SecuritySecurity system overview and design checks.ELV-303Access Control System Master LabDoors, readers, controllers and lock power.ELV-307Structured Cabling & Data NetworksThe backbone every ELV system rides on.ELV-304PAVA, BGM & Azan LabVoice alarm, background music and Azan systems.ELV-306