HVAC-406 · HVAC · VENTILATION

Ventilation Rates & Fresh Air Lab

Work out outdoor air for every zone with the ASHRAE 62.1 ventilation rate procedure, roll it up to the air handler with the multi-zone system efficiency, compare against AS 1668.2 and CIBSE rates, add toilet and kitchen exhaust, and see the CO₂ each zone will settle at.

ASHRAE 62.1Dubai Green Building RegulationsEstidamaAS 1668.2NZBC G4CIBSE Guide A

How to use: add your zones with their space type and area. Occupancy fills from the default density, and you can overwrite it. Tap i for explanations.

1. System settings

One air handler serving the zones below.

Method
Exhaust

2. Zones

Bar length shows outdoor air per zone. Colour shows steady state CO₂.

3. Checks

    4. Zone table

    5. How the procedure works

    Breathing zone outdoor air

    ASHRAE 62.1 adds a people part and an area part: Vbz = Rp × Pz + Ra × Az. The people part dilutes what occupants emit, the area part dilutes what the building and furniture give off. Dividing by the zone air distribution effectiveness Ez gives the zone outdoor air Voz.

    Multi-zone systems

    When one air handler serves many zones, the zone needing the highest fraction of outdoor air in its supply (Zpz) sets the system ventilation efficiency Ev. The intake is the uncorrected outdoor air divided by Ev, so a single dense meeting room can drive up the fresh air for the whole floor. DOAS and FAHU systems avoid this.

    CO₂ as a check

    At steady state, indoor CO₂ rises above outdoor by the CO₂ each person exhales (about 0.0052 L/s for office work) divided by the outdoor air per person. 10 L/s per person gives roughly 520 ppm above outdoor.

    Learning and checking tool. Use the edition of ASHRAE 62.1 or the local standard your authority has adopted. Healthcare spaces follow ASHRAE 170 or HTM 03-01 instead.

    Quick summary in your language

    Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

    This lab works out fresh air for each zone and the whole system with ASHRAE 62.1, plus toilet and kitchen exhaust. Too little fresh air raises CO2, so check the occupied rooms first.

    About this lab: Ventilation Rates & Fresh Air Lab

    Ventilation Rates & Fresh Air Lab

    Work out outdoor air per zone with the ASHRAE 62.1 ventilation rate procedure, the multi-zone system efficiency, toilet and kitchen exhaust, AS 1668.2 comparison and CO₂ levels.

    Topics you can explore

    • People and area outdoor air rates
    • Zone air distribution effectiveness
    • Multi-zone system efficiency
    • Dedicated outdoor air systems
    • Exhaust and building pressure
    • CO₂ as a ventilation check

    Practical engineering example

    A 1,470 m² office floor with meeting rooms, a training room and a pantry needs about 1,080 L/s of outdoor air added zone by zone. The training room needs over half its supply as fresh air, so the multi-zone efficiency falls to about 0.5 and the AHU intake doubles to about 2,040 L/s. A dedicated fresh air unit would avoid most of that.

    Developed by Eng. Mannan Maqsood. Verify against current project requirements and the applicable authority rules.

    Project checks

    Identify the actual occupancy and ventilation method before calculating outdoor air. Check the intake conditions and measured delivery separately from the minimum quantities required under the adopted basis.

    NEXT STEP

    Where to go from here

    Related labs that pick up where this one ends.

    FAHU Electro-Mechanical LabTreat the outdoor air before it reaches the zones.E-118 →Duct Sizing & Fan Static LabSize the fresh air ducts.HVAC-403 →Cooling Load & Duct Static LabAdd the fresh air load.DES-603 →HVAC Virtual Engineering LabPsychrometrics and AHUs in 3D.HVAC-401 →
    Your work in each lab is saved in this browser.Save or move my progress · All 127 labs · Ask the Copilot