Codes & standards 3
AS/NZS 3500.4BS 8515CIBSE Guide G
Regions 4
DubaiAbu DhabiAustraliaNew Zealand
Views
2D3D4D
Q&A506 Plumbing questions →Site cases46 Plumbing site cases →
PLB-704 · PLUMBING · SUSTAINABLE WATER

Solar Hot Water, Rainwater & Condensate Lab

Size a solar hot water system: daily hot water, storage, collector area for your solar fraction and the back-up heater. Then size a recycled water tank fed by rainwater and AHU condensate, month by month, and see how much mains water it saves. In the Gulf the condensate usually beats the rain many times over.

Dubai Al Sa'fatEstidama Pearl RatingAS/NZS 3500.4NZBC G12BS 8515CIBSE Guide G

How to use: pick a city to load climate data, then set the building. Every field has an i with a plain explanation.

Location
Hot water demand

2. View

3. Checks

    4. Monthly figures

    5. How it works

    Solar hot water

    Daily heat = hot water volume × 4.19 kJ/kg K × (60 °C − cold water temperature). Solar collectors deliver about the daily irradiation on the collector × system efficiency, so the collector area is the solar share of the heat divided by that yield. The worst month sets the area if you want the target all year, the average if annual is enough. Dubai's Al Sa'fat requires solar water heating for a large share of domestic hot water in many building types.

    Back-up and Legionella

    Store at 60 °C and distribute at 50 °C or more so Legionella cannot grow. The back-up heater must reheat the store within the recovery time on a cloudy day.

    Rainwater and condensate

    Rainwater yield = roof area × rainfall × runoff coefficient. Condensate from AHU cooling coils = air mass flow × the moisture removed. In humid Gulf summers each 1,000 L/s of fresh air can give close to 1 m³ of clean, cold water a day, at exactly the time irrigation demand peaks.

    Learning and checking tool. Climate figures are typical long term averages. Use project data and the authority's rules for recycled water treatment and labelling.

    Quick summary in your language

    Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

    This lab sizes solar hot water, rainwater harvesting and AHU condensate recovery month by month. Condensate from air handling units is a large free water source in the Gulf, so plan to reuse it.

    About this lab: Solar Hot Water, Rainwater & Condensate Lab

    Solar Hot Water, Rainwater & Condensate Lab

    Size solar hot water collectors, storage and back-up for a solar fraction target, then size rainwater and AHU condensate recovery month by month for Dubai, Abu Dhabi, Riyadh, Auckland or Sydney.

    Topics you can explore

    • Hot water demand and heat
    • Collector yield and solar fraction
    • Back-up heater and recovery
    • Stagnation in hot climates
    • Rainwater yield
    • AHU condensate yield
    • Recycled water tank balance

    Practical engineering example

    A 400 person apartment building in Dubai using 50 L of hot water each a day needs about 270 MWh of heat a year. A 75% solar fraction takes roughly 200 m² of collectors. The same building with 15,000 L/s of fresh air recovers around 2,600 m³ of condensate a year against about 190 m³ of rainwater from a 2,500 m² roof.

    Developed by Eng. Mannan Maqsood. Verify against current project requirements and the applicable authority rules.

    Project checks

    Keep solar hot water, harvested rainwater and condensate as distinct services. Check approved uses, separation and overflow or disposal arrangements before combining them with other building systems.

    NEXT STEP

    Where to go from here

    Related labs that pick up where this one ends.

    Water Storage Tank Sizing LabSize the main domestic storage.PLB-702 →Ventilation Rates & Fresh Air LabFresh air flow sets the condensate.HVAC-406 →FAHU Electro-Mechanical LabWhere the condensate comes from.E-118 →Drainage Stack & Building Drain LabDrainage for the same building.PLB-703 →
    Your work in each lab is saved in this browser.Save or move my progress · All 127 labs · Ask the Copilot