Codes & standards 1
BS 7671
Regions 1
Dubai
Views
Calculator and tables
Q&A502 coordination questions →Site cases20 Coordination site cases →
MEP-802 · POCKET MODE · ON SITE

Pocket Site Calculator

The quick numbers you need on site, sized for a phone: unit conversions, current from load, voltage drop, Ohm's law, pipe and duct velocity, cooling from water flow and a rough cooling load. Add it to your home screen and it works offline.

Tip: on your phone, use the browser menu and choose Add to Home Screen. Every box remembers your last values.

Convert

Current from load

Voltage drop (quick)

Resistance only at 70 °C. Good for a quick check on site. Use DES-604 or the cable sizing lab for the design.

Ohm's law

Pipe velocity

Duct velocity

Cooling from water

Rough cooling load

Quick summary in your language

Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

This pocket calculator gives quick site answers on your phone: unit conversions, current, voltage drop, pipe and duct velocity and cooling. Use it for quick checks, then confirm with the full lab.

About this lab: Pocket Site Calculator

Pocket Site Calculator

Quick MEP calculations on your phone: unit conversions, current from load, voltage drop, Ohm's law, pipe and duct velocity, cooling from water flow and rough cooling load.

Topics you can explore

  • Unit conversions
  • Three phase current
  • Voltage drop
  • Ohm's law
  • Pipe and duct velocity
  • Cooling from flow and ΔT

Practical engineering example

On site you can check that a 60 m run of 6 mm² copper carrying 27 A on 400 V three phase drops about 10.5 V, or 2.6%, which is inside the usual 5% limit for power circuits.

Developed by Eng. Mannan Maqsood. Verify against current project requirements and the applicable authority rules.

Project checks

Use a site calculation to screen a stated condition and retain its inputs and units. Confirm the design basis and instrument evidence before turning a quick result into an acceptance decision.

NEXT STEP

Where to go from here

Related labs that pick up where this one ends.

Cable Sizing & Voltage DropThe full cable design.DES-604 →FAT, SAT & Site Testing LabTests and commissioning checklists.SITE-506 →Duct Sizing & Fan Static LabSize the whole duct tree.HVAC-403 →Plant Room & Riser Space PlannerConcept plant space for all trades.MEP-801 →
Your work in each lab is saved in this browser.Save or move my progress · All 127 labs · Ask the Copilot