MV-502 · Phase 1 Foundations

MV Cables & Accessories Lab

Peel an XLPE cable apart in 3D, size it with an IEC 60287 rating engine, see what sheath bonding does to standing voltage and losses, and build a termination step by step.

In short

  • An MV XLPE cable has a conductor, semicon conductor screen, XLPE insulation, semicon insulation screen, metallic screen and oversheath. Armoured cables add bedding and armour.
  • 11 kV systems use 6.35/11 (12) kV cable with 3.4 mm nominal XLPE insulation (IEC 60502-2). 22 kV uses 5.5 mm and 33 kV uses 8.0 mm.
  • Size the cable on three checks: current rating for the real installation, short-circuit withstand (A ≥ I√t / k, with k = 143 for Cu and 94 for Al) and voltage drop.
  • Soil thermal resistivity and ground temperature have a big effect. Dry GCC desert sand can cut the rating by around a third compared with moist soil.
  • Single-core cables bonded at both ends carry circulating screen currents. Single-point or cross bonding removes them but creates standing voltages that need limiting.

3D XLPE Cable Explorer 3D

The cable is shown cut back in steps so you can see every layer. Drag to rotate, click a layer to learn what it does, and change the voltage to see the insulation get thicker.

Single-core 240 mm² Cu ·
Drag: rotate · Wheel/pinch: zoom · Click: inspect

Click a layer

Pick any layer of the cable to learn what it does. Switch the level at the top to get more technical detail.

MV Cable Sizing Calculator (IEC 60287) Calc

Rates every standard size for your installation, then checks short-circuit withstand and voltage drop. It picks the smallest size that passes all three. Click a row to see the details and use that size in the bonding lab.

Recommended size
-

All sizes

SizeRating (A)LoadShort circuitVolt drop

Details

ExpertMethod: IEC 60287-1-1 for Rac (skin and proximity), dielectric loss and screen loss factor λ1. T1 and T3 from layer thicknesses. T4 from IEC 60287-2-1: trefoil touching for buried cables, three ducts in trefoil for ducted cables, and the iterative free-air method (Z = 0.96, E = 1.25, g = 0.2) on tray. Eddy current losses in wire screens and drying-out of soil are ignored. Cable dimensions are typical, not one manufacturer's.

Results are indicative. Confirm with the manufacturer's data or a full IEC 60287 study for final design.

Sheath Bonding Simulator 2D Animated

Pick a bonding method and change the load and route length. The diagram shows where screen current flows, and the chart shows the standing voltage along the route. It uses the size selected in the calculator.

4D Termination Build 3D 4D

Follow a heat-shrink termination on a single-core cable as it is built over time. The field plot below shows why stress control matters at the screen cut.

Step 1

    Electric field at the screen cutNo stress control

    Illustrative equipotential lines. Where lines crowd together the electrical stress is high.

    What are the layers of an MV XLPE cable?

    Every layer in an MV cable has a job. Working from the centre out:

    • Conductor: compacted stranded copper or aluminium to IEC 60228 class 2. It may be water-blocked.
    • Conductor screen: a thin extruded semiconducting layer. It smooths the electric field around the strands so there are no sharp points.
    • XLPE insulation: cross-linked polyethylene, rated for 90 °C continuous and 250 °C in a short circuit.
    • Insulation screen: another semiconducting layer, bonded or strippable. It gives the field an even outer boundary.
    • Metallic screen: copper wires and/or tape. It carries the charging current and the earth fault current, and keeps the outside of the cable at earth potential.
    • Oversheath: PE for buried cables, PVC, or LSZH where fire performance in buildings matters.
    • Armour (optional): aluminium wire (AWA) on single-core cables, so it does not heat up in the magnetic field, or steel wire (SWA) on three-core cables.

    PractitionerConductor screen, insulation and insulation screen are extruded together in one pass (triple extrusion) and dry cured. This avoids voids and contamination at the interfaces, which is where partial discharge starts.

    How do you size an MV cable?

    1. Design current: I = S / (√3 × V). For ring cables, use the full ring transfer load, not just one substation.
    2. Current rating: rate the cable for how it is really laid, including soil thermal resistivity, ground temperature, depth, grouping, ducts and the bonding method. IEC 60287 is the reference method. Manufacturers' tables are based on it, with correction factors.
    3. Short circuit: A ≥ I × √t / k. For XLPE (90 °C to 250 °C), k = 143 for copper and 94 for aluminium. Also check the metallic screen against the earth fault current and duration.
    4. Voltage drop: usually small at MV, but check long feeders and rural lines.
    5. Practical checks: bending radius, pulling tension, termination size in the RMU, and the utility's standard sizes.

    ExpertFor the most onerous section of a route (a road crossing in ducts, a section near a hot pipe, or a riser shaft), rate that section separately. The hottest section sets the rating for the whole circuit. Where the soil may dry out around loaded cables, IEC 60287-2-1 lets you model a dried zone with a higher resistivity, or you can specify thermally stable backfill with a tested resistivity.

    Why do soil resistivity and ground temperature matter so much?

    Almost all the heat from a buried cable must flow out through the soil, so the soil's thermal resistance (T4) is usually the largest term in the rating. Moist soil might be 1.0 K·m/W, while dry desert sand can be 2.5 to 3.0 K·m/W. Ground temperature at depth in the GCC can be 35 °C or more, which leaves less temperature headroom before the 90 °C limit. Use the calculator above and change these two values to see the effect.

    Sheath bonding: both ends, single point or cross bonded?

    • Both ends bonded: simple and safe, with no standing voltage. But the magnetic field induces circulating currents in the screens, which add heat. The effect grows with conductor size, screen area and cable spacing.
    • Single-point bonded: earthed at one end only, so no circulating current flows. A standing voltage builds up at the open end in proportion to load and length, so sheath voltage limiters (SVLs) and often a parallel earth continuity conductor are fitted.
    • Cross bonded: the route is split into three minor sections with screen transpositions at link boxes. The induced voltages cancel over each major section, which suits long routes.

    Many utilities set a limit for standing voltage under full load, often around 50 to 65 V. Check your utility's rule.

    How is an MV cable terminated?

    A termination has to do three things: control the electric field where the screen stops, insulate the exposed length of insulation, and seal the cable against moisture. The usual types are heat-shrink, cold-shrink and pre-moulded (including the screened separable connectors used in RMUs). Preparation matters more than the kit itself: a square, clean cut of the insulation screen, no nicks in the insulation, clean surfaces and correct dimensions from the kit instructions.

    Regional notes

    GCC

    Cables are usually to IEC 60502-2 or BS 6622, with LSZH sheaths (BS 7835) inside buildings. Design for high ground temperatures and dry sand, and use thermally stable backfill where the utility specifies it. Only use cable makes and sizes the utility has approved (DEWA, AADC/ADDC, SEWA, KAHRAMAA, MEW, SEC and others).

    Australia and New Zealand

    MV cables are to AS/NZS 1429.1. AS/NZS 3008 covers LV cables, so MV ratings come from IEC 60287 or manufacturers' data. Network operators publish their own standard cable sizes, laying details and bonding rules.

    Asia

    IEC 60502-2 is the common base, with national versions such as IS 7098-2 in India. Utilities such as TNB and SP Group set their own standard sizes and accessory types.

    Test yourself

    0 / 10

    Ten questions on MV cables. Pick an answer to see the explanation. Practise about 50 more MV-502 questions in the MV Question Bank.

    Frequently asked questions

    What are the layers of an MV XLPE cable?
    From the centre out: a copper or aluminium conductor, a semiconducting conductor screen, XLPE insulation, a semiconducting insulation screen, a copper wire or tape metallic screen, then an outer sheath of PE, PVC or LSZH. Armoured cables add bedding and aluminium wire armour (single-core) or steel wire armour (three-core).
    What is the insulation thickness of an 11 kV XLPE cable?
    IEC 60502-2 gives a nominal XLPE insulation thickness of 3.4 mm for 6/10 (12) kV cables, which are used on 11 kV systems. It is 5.5 mm for 12/20 (24) kV and 8.0 mm for 18/30 (36) kV.
    What is the k factor for short-circuit sizing of XLPE cables?
    For XLPE insulation with an initial temperature of 90 °C and a final temperature of 250 °C, k is about 143 for copper and 94 for aluminium conductors. The minimum area is A = I × √t / k.
    What is the difference between single-point and both-ends bonding?
    Bonding the screens at both ends lets circulating currents flow, which adds heat and lowers the rating, mainly on large single-core cables. Single-point bonding stops circulating currents but leaves a standing voltage on the open end that rises with load and route length, so sheath voltage limiters are fitted. Cross bonding transposes the screens at link boxes to cancel the induced voltages over long routes.
    Why do MV cable terminations need stress control?
    Where the insulation screen is cut back, the electric field concentrates at the screen edge. Without stress control this can cause partial discharge and failure. A stress control tube, mastic or a geometric stress cone spreads the field out along the insulation.

    Standards referenced

    • IEC 60502-2 Extruded cables 6 kV to 30 kV
    • IEC 60287-1-1, IEC 60287-2-1 Current rating calculation
    • IEC 60228 Conductors, IEC 60949 Short-circuit limits
    • BS 6622, BS 7835 (UK and GCC practice)
    • AS/NZS 1429.1 (Australia and New Zealand)
    • IS 7098-2 (India)

    Quick summary in your language

    Read this lab's key points in English, Urdu, Hindi or Arabic. The lab itself is in English.

    This lab shows MV cable layers in 3D, rates 6.6 to 33 kV cables and checks voltage drop, short circuit and sheath bonding. Follow the termination sequence exactly, as most cable failures start at joints.

    Project checks

    Review the cable system as the cable, accessories, screen bonding and route together. Confirm installation limits and termination compatibility with the actual cable construction and manufacturer instructions.

    NEXT STEP

    Where to go from here

    Related labs that pick up where this one ends.

    Medium Voltage hubAll 16 MV labs and the 788-question MV bank.MV HUBMV Systems & Network ExplorerFollow power from grid to building in 3D, compare radial, open and closed ring MV networks under fault, and…MV-501 · previousRMU & MV Switchgear LabExplore an 11 kV ring main unit in 3D, operate the interlocks, play 4D switching sequences and size MV…MV-503 · nextHV Cable Engineering LabRate 11 to 33 kV cables to IEC 60287, check short-circuit withstand to IEC 60949, compare laying methods and…HV-505 · HV view
    Track what you have opened on My progress.All labs → · Ask the Copilot →