MV Systems & Network Explorer
3D grid-to-building network with voltage levels by utility, radial and ring topologies, and neutral earthing methods.
Sixteen interactive labs for 6.6 kV to 33 kV networks. You can see the equipment in 3D, run the switching, calculate the ratings and test yourself, with rules for the GCC, Australia, New Zealand and Asia.
Normal running
Times shown are typical for a manual switching response and will vary by utility and by how much automation the network has.
Live single line diagrams, phasors, TCC curves and waveforms that respond as you change inputs.
Rotate, explode and x-ray RMUs, transformers, cables and substations. Click any part to learn what it does.
3D plus time: switching programs, fault restoration, installation sequences and project timelines you can scrub through.
Every lab has Beginner, Practitioner and Expert levels, plus a region switch for GCC, AU, NZ and Asia rules.
These are typical utility distribution voltages. Click a row to load that region into the network simulator above. Always confirm current values with the local utility, since networks change.
| Country / utility | Typical MV distribution | Upstream | Frequency | Notes |
|---|---|---|---|---|
| UAE - Dubai DEWA | 11 kV | 132 kV | 50 Hz | Building substations fed from 132/11 kV primary substations. |
| UAE - Abu Dhabi ADDC / AADC | 11 kV and 33 kV | 132 kV | 50 Hz | 33 kV used for large loads and as subtransmission to 33/11 kV substations. |
| UAE - Sharjah SEWA | 11 kV and 33 kV | 132 kV | 50 Hz | Mixed 33 kV and 11 kV distribution. |
| Saudi Arabia SEC | 13.8 kV and 33 kV | 110 / 132 kV | 60 Hz | The only 60 Hz GCC grid. 13.8 kV is common in cities. |
| Qatar KAHRAMAA | 11 kV | 66 kV | 50 Hz | 66/11 kV primary substations feed 11 kV rings. |
| Kuwait MEW | 11 kV | 132 kV | 50 Hz | 132/11 kV primary substations. |
| Oman Nama distribution companies | 11 kV and 33 kV | 132 kV | 50 Hz | 33 kV widely used outside dense urban areas. |
| Bahrain EWA | 11 kV | 66 kV | 50 Hz | 66/11 kV primary substations. |
| Australia Ausgrid, Energex, Western Power and others | 11 kV and 22 kV | 33 / 66 / 132 kV | 50 Hz | 22 kV common in Victoria and WA. SWER lines in rural areas. |
| New Zealand Vector, Orion, Wellington Electricity and others | 11 kV and 22 kV | 33 / 110 kV | 50 Hz | 22 kV used in parts of Auckland and in rural networks. |
| India State DISCOMs | 11, 22 and 33 kV | 66 / 132 kV | 50 Hz | 11 kV is the main urban distribution voltage. |
| Malaysia TNB | 11, 22 and 33 kV | 132 kV | 50 Hz | 22 kV and 33 kV common in newer developments. |
| Singapore SP Group | 22 kV and 6.6 kV | 66 kV | 50 Hz | 22 kV is the main distribution voltage. |
| Pakistan DISCOs (K-Electric, LESCO and others) | 11 kV | 132 kV | 50 Hz | 132/11 kV grid stations. |
| Hong Kong CLP Power, HK Electric | 11 kV | 132 kV | 50 Hz | 11 kV ring networks in dense urban areas. |
Data reviewed 21 Oct 2026. Sources: utility network descriptions and published distribution codes.
Built in four phases, plus a 4D capstone. Live modules are marked in green.
3D grid-to-building network with voltage levels by utility, radial and ring topologies, and neutral earthing methods.
Exploded 3D XLPE cable, sizing to IEC 60502-2, AS/NZS 1429.1 and BS 6622, sheath bonding, and 4D termination and joint install.
3D ring main unit with x-ray and exploded views, a live interlock simulator, 4D switching sequences and a spec configurator.
Animated vector group phasors, oil vs cast resin, losses and MEPS, tap changers, parallel operation and sizing.
Room layout in 3D with live clearance checks, transformer room ventilation, oil containment and a 4D construction sequence.
IEC 60909 fault levels from the 11 kV source to the final DB, animated fault path, switchgear rating checks and voltage profile.
Live TCC plotting of IDMT relays, HV fuses and LV ACBs, grading margin checks, an animated trip sequence and CT knee-point sizing.
IEEE 80 earth grid design with a 3D surface potential map and a 4D walk-through of step and touch voltages during a fault.
Virtual IR/PI, VLF tan delta, TTR, winding resistance and secondary injection tests with interpretation, plus a saved ITP checklist.
Build a switching program from step cards, run it on a live ring and get scored on safety, outages and permits.
Connection stages from application to energisation, documents per stage, a critical path Gantt and a 4D project timeline.
Harmonic waveform lab with THD and K-factor, IEEE 519 checks, capacitor bank sizing and resonance with detuned reactors.
A 4D day of solar, battery and EV charging on an MV connection, voltage rise at the point of connection and regional grid rules.
Millisecond timeline of sampled values, GOOSE trips and SCADA reporting, PRP/HSR redundancy and process bus bandwidth.
Duval Triangle DGA, thermography with load correction, a 12-month PD trend with PRPD patterns and failure investigations.
Capstone: load, transformers, RMU, cable and room design with an editable BOQ, cost estimate and a 4D build programme.
About 50 questions per module at three levels, with regional questions for the GCC, Saudi Arabia, Australia, New Zealand and Asia. Practise with instant explanations or sit a timed exam.
Choose a study path based on the intended MV network, utility boundary and equipment. Check the actual service voltage and adopted requirements before transferring a learning result to a project.
Related labs that pick up where this one ends.